Laserfiche WebLink
4 <br /> t <br /> Enzineedna-, De=sigtz and Pl g <br /> MCR Engineering, Inc. $ 19,000.00 <br /> Water Main Installation and Individual Hook-tips <br /> Price Derived from Mid-Priced Contractor <br /> (Teichert Construction) $231 ,600.00 <br /> City om <br /> f Manteca Permit Fees <br /> Typically 5% of Construction Costs s$ 1 1 ��O.00 <br /> Total of Option 11 B $262, 180.00 <br /> These construction costs include connection to every address along Airport <br /> Way, a total of 21. Please be aware that the lowest construction bid was <br /> $178,000 and the highest bid was $479,000. The highest bidder, Carl <br /> Crutchfield Construction, was the only one of the three that actually visited <br /> the sites. <br /> These costs do not include any labor on ASE's part for items such as, but n o t <br /> limited to, project management, permit acquisition, field activities, gaining <br /> pre-approval from the USTCF, reporting, etc. Should ASE's involvement be <br /> required, labor will be billed at standard billing rates, and all subcontracted <br /> items and materials will be billed at cost plus 15%. <br /> GRAND TOTAL OF OPTION II $2 6 7 ,3 9 0 . 0 0 <br /> This solution would obviously be permanent. The domestic wells could be <br /> taken completely out of service. ASE believes this option would b e <br /> acceptable to a majority of the residences; although, there does appear to <br /> be opposition from several of the residents to being annexed into the city <br /> and/or having to pay a water bill. <br /> The length of a water main required to provide water to all the affected <br /> properties along Airport Way is approximately 1,200-feet. The City of <br /> Manteca has stated that ' they would require the installation of the water <br /> main to extend from the Airport Way/Yosemite Avenue intersection all the <br /> way to the Airport Way/Crom Street intersection, which totals <br /> approximately 3,000-feet. During the meeting on May 10, 2001, Mr. Robert <br /> Trommer of the USTCF stated he was uncertain if his agency could <br /> reimburse for costs associated with any, a portion of, or the total length of <br /> the proposed water main. <br /> I <br /> -4- <br />