My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 5:02:58 PM
Creation date
7/23/2020 4:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DRAFT ENVIRONMENTAL IMPACT REPORT
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 INTRODUCTION <br /> 1.1 PURPOSE OF THE ENVIRONMENTAL IMPACT REPORT <br /> The City of Manteca(City)has prepared this draft environmental impact report(DEIR)to disclose the potential <br /> environmental effects of the proposed Manteca Wastewater Quality Control Facility(WQCF) and Collection <br /> System Master Plans Update Project(project). This DEIR was prepared in compliance with the California <br /> Environmental Quality Act(CEQA)of 1970 (as amended through Public Resources Code Section 21000 et seq.) <br /> and the State CEQA Guidelines (California Code of Regulations Section 15000 et seq.). An EIR is a full <br /> disclosure,public information document in which the significant environmental impacts of a project are <br /> evaluated, feasible measures to mitigate significant impacts are identified, and alternatives to the project that can <br /> reduce or avoid significant environmental effects are considered. <br /> An EIR is an informational document used in the planning and decision-making process by the lead agency and <br /> responsible and trustee agencies. The lead agency is the public agency with primary responsibility over the <br /> project. In accordance with State CEQA Guidelines Section 15051(b)(1), "the lead agency will normally be the <br /> agency with general governmental powers, such as a city or county,rather than an agency with a single or limited <br /> purpose."In the case of the proposed project,the lead agency is the City of Manteca,which will be responsible <br /> for overall approval. <br /> The purpose of an EIR is not to recommend either approval or denial of a project. CEQA requires decision- <br /> makers to balance the benefits of a project against its unavoidable environmental effects in deciding whether to <br /> carry out a project. The lead agency will consider the DEIR, comments received on the DEIR, and responses to <br /> those comments before making a decision. If environmental impacts are identified as significant and unavoidable, <br /> the lead agency may still approve the project if it determines that the social, economic, or other benefits outweigh <br /> the unavoidable impacts. The lead agency would then be required to prepare"Findings"and a"Statement of <br /> Overriding Considerations"that discuss the specific reasons for approving the project,based on information in the <br /> EIR and other information in the record. <br /> 1.2 SCOPE OF THE ENVIRONMENTAL IMPACT REPORT <br /> Pursuant to Section 15143 of the State CEQA Guidelines, a lead agency may limit the EIR's discussion of <br /> environmental effects to specific issues where significant effects on the environment may occur. The City used a <br /> variety of information to determine which issue areas would result in potentially significant or significant effects <br /> on the environment. This information included field surveys of the project site,review of project characteristics, <br /> comments from public and agency consultation, and comments received on the notice of preparation(NOP).An <br /> NOP was circulated to public agencies and the public on May 25,2006, for a 30-day review period. A public <br /> scoping meeting was held on June 14, 2006, at 5 p.m. in the Manteca City Council Chambers. Comments received <br /> on the NOP are included in Appendix A. Since publication of the NOP,the City decided to alter the alignments of <br /> several proposed wastewater collection system pipeline segments (see Exhibit 3-3, "Proposed Project <br /> Components"). These changes do not substantially alter the elements of the project as described in the NOP <br /> because the new collection system pipeline alignment is similar to the original collection system alignment as <br /> described in the NOP,and the new collection system would connect to the existing collection system primarily <br /> within previously developed portions of the city. <br /> Based on the NOP,public comments on the NOP, and preliminary analysis,the project would have less-than- <br /> significant impacts on recreation and population and housing as discussed below. These issues will not be <br /> evaluated further in this DEIR. <br /> Manteca WQCF and Collection System Master Plans EIR EDAW <br /> City of Manteca 1-1 Introduction <br />
The URL can be used to link to this page
Your browser does not support the video tag.