Laserfiche WebLink
M m <br /> D Table 2-2 <br /> Summary of Impacts and Mitigation Measures <br /> SCD„ Significance Significance <br /> 3 Impacts Before Mitigation Measures After <br /> Mitigation Mitigation <br /> at any one time. <br /> ► The requirements listed above can be met through any <br /> combination of on-site,emission-reduction measures or off- <br /> site fees. The ISR rule provides a method of calculating fees <br /> to be paid to offset any NOx and PM,o emission reductions <br /> that would not be achieved by selection of construction <br /> equipment and fuels. <br /> B. The City of Manteca will ensure that the proposed project <br /> complies with SJVAPCD's Regulation VIII,"Fugitive Dust <br /> Prohibitions,"and that all applicable control measures,as <br /> required by law,are implemented during construction to reduce <br /> the generation of fugitive PMIO and PM2.5 emissions.Regulation <br /> VIII contains,but not limited to,the following required control <br /> measures. <br /> IP 1. Prewater site sufficient to limit visible dust emissions <br /> (VDE)to 20%opacity. <br /> 2. Phase work to reduce the amount of disturbed surface area <br /> at any one time. <br /> 3. During active operations,apply water or chemical/organic <br /> stabilizers/suppressants sufficient to limit VDE to 20% <br /> v opacity. <br /> p4. During active operations,construct and maintain wind <br /> T barriers sufficient to limit VDE to 20%opacity. <br /> Q5. During active operations,apply water or chemical/organic <br /> n stabilizers/suppressants to unpaved haul/access roads and <br /> m unpaved vehicle/equipment traffic areas sufficient to limit <br /> o VDE to 20%opacity and meet the conditions of a stabilized <br /> unpaved road surface. <br /> 6. An owner/operator shall limit the speed of vehicles traveling <br /> on uncontrolled unpaved access/haul roads within <br /> construction sites to a maximum of 15 miles per hour. <br /> o7. An owner/operator shall post speed limit signs that meet <br /> v State and Federal Department of Transportation standards at <br /> Cn each construction site's uncontrolled unpaved access/haul <br /> M <br /> road entrance.At a minimum,speed limit signs shall also be <br /> LTS=Less than Significant S=Significant PS=Potentially Significant SU=Significant and Unavoidable <br />