Laserfiche WebLink
M m <br /> X p <br /> 0 > Table 2-2 <br /> Summary of Impacts and Mitigation Measures <br /> C" Significance Significance <br /> C <br /> Impacts Before Mitigation Measures After <br /> Mitigation Mitigation <br /> 4.5-8:Impacts on Wildlife Movement and Nursery Sites. LTS No mitigation is necessary. LTS <br /> Implementation of the proposed project would not substantially <br /> interfere with wildlife movement or impede the use of wildlife <br /> nursery sites because the project area does not connect open <br /> space that serves as important wildlife habitat or nursery sites. <br /> This would be a less-than-significant impact. <br /> 4.5-9:Impacts on Protected and Heritage Trees. PS 4.5-9:Impacts on Protected and Heritage Trees.The City will LTS <br /> Implementation of the proposed project would result in the implement the following measures to reduce impacts of the proposed <br /> potential loss and disturbance of native oaks and other existing project on protected and heritage trees: <br /> trees that are protected by local ordinances.This impact would ► Before project implementation,a tree survey shall be conducted <br /> be potentially significant. by a qualified botanist to enumerate and evaluate all trees that <br /> meet standards in the applicable City codes outlined above that <br /> could be affected by implementation of the proposed project. <br /> ► Trees that are subject to protection,but must be removed as a <br /> result of project implementation,will be replaced in accordance <br /> with tree planting specifications established by the City Tree <br /> Ordinance.Replacement trees will be planted on-site at a <br /> location in the general vicinity that is consistent with City <br /> v <br /> standards. <br /> m ► Replacement tree plantings will be monitored in accordance with <br /> City monitoring protocols. <br /> p If monitoring indicates that replacement plantings are not meeting <br /> T performance standards,remedial measures will be implemented. <br /> QAppropriate measures will be determined by the City. and will be <br /> o implemented until it is demonstrated that replacement plantings meet <br /> CD performance standards. <br /> 4.5-10: Impacts on Sensitive Habitats,Including PS 4.5-10: Impacts on Sensitive Habitats,Including Jurisdictional LTS <br /> Jurisdictional Waters of the United States.Implementation of Waters of the United States.The City will avoid impacts on the San <br /> the project could result in fill or reconfiguration of less than 1 Joaquin River and its tributaries and impacts on freshwater marsh <br /> acre of potentially jurisdictional waters of the United States, habitat within the French Camp Outlet Canal and its tributaries by <br /> �? including drainage canals and the San Joaquin River,and implementing the following construction methods: <br /> o associated freshwater marsh and riparian habitat.This impact <br /> P. trenchless construction methods such as horizontal directional <br /> M v would be potentially significant. <br /> M Cn drilling or bore-and-jack to bore under the French Camp Outlet <br /> m m Canal in two locations and bore under a tributary of the French <br /> v �u <br /> LTS=Less than Significant S=Significant PS=Potentially Significant SU=Significant and Unavoidable <br />