M m <br /> C) Table 2-2 <br /> Summary of Impacts and Mitigation Measures <br /> C„ Significance Significance <br /> 3 Impacts Before Mitigation Measures After <br /> Mitigation Mitigation <br /> item 1 above every 6 months to determine whether any pavement <br /> degradation(e.g.,potholes,pavement separation)has occurred <br /> from preconstruction conditions. <br /> 4. Where roadways show evidence of degradation below acceptable <br /> standards as determined by the City Department of Public <br /> Works,the City will repair degraded sections to acceptable <br /> standards. <br /> 5. Lane closures will be identified including specific times of <br /> closure.All lane closures will be limited to the hours between 9 <br /> a.m.and 4 p.m. <br /> A copy of the plan will be submitted to local emergency response <br /> agencies and these agencies will be notified at least 14 days before <br /> the commencement of construction that would partially or fully <br /> obstruct local roadways. <br /> IP <br /> The City Public Works Department will ensure that project <br /> 4�- contractors adhere to the provisions of the plan and maintain a copy <br /> of the plan at project construction sites. <br /> 4.12 Cultural Resources <br /> :3 4.12-1:Damage to or Destruction of Documented Cultural LTS No mitigation is necessary. LTS <br /> 0 Resources in Surveyed Areas.The entire project area,with the <br /> exception of a 3.35-mile portion of the pipeline route for the <br /> p proposed wastewater collection system and a 1.5-mile portion of <br /> T the pipeline alignment for the proposed recycled-water <br /> Qdistribution system,has been surveyed for cultural resources. <br /> 0 Archival and field research has demonstrated that there are no <br /> 0 <br /> CD known archaeological or historical resources within the surveyed <br /> o project area.Because there are no known recorded <br /> C/, archaeological sites,features,or artifacts or historical resources <br /> within the surveyed portion of the project area,the project's <br /> D impact on known archaeological and historical resources would <br /> be less than significant. <br /> cn <br /> 0 <br /> 4.12-2: Damage to or Destruction of Undiscovered Cultural PS 4.12-2:Damage to or Destruction of Undiscovered Cultural LTS <br /> v Resources.Portions of the project area(including a 3.35-mile Resources.Before the beginning of any project construction activity <br /> Cn segment of the pipeline route for the proposed wastewater that could affect the previously unsurveyed portions of the project <br /> 0collection system and a 1.5-mile portion of the pipeline site,qualified archaeologists shall survey all portions of the site that <br /> LTS=Less than Significant S=Significant PS=Potentially Significant SU=Significant and Unavoidable <br />