My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
1176
>
2800 - Aboveground Petroleum Storage Program
>
PR0528253
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 10:51:38 PM
Creation date
7/24/2020 1:18:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0528253
PE
2832
FACILITY_ID
FA0003822
FACILITY_NAME
ESCALON UNIFIED SCHOOL DIST
STREET_NUMBER
1176
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22705007
CURRENT_STATUS
01
SITE_LOCATION
1176 STANISLAUS ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations <br /> that have not been addressed for ESCALON UNIFIED SCHOOL DIST as of July 02 , <br /> 2020 . <br /> Open violations from July 16 , 2018 inspection <br /> Violation #203 - Failure to implement the SPCC Plan . <br /> The SPCC plan states that Appendix E of the plan will be posted next to loading areas. Appendix E , <br /> describing unloading/loading procedures was not seen posted near the loading/unloading areas. The SPCC <br /> plan calls for spill kits to be placed near the dispensers , spill kits were not observed near the dispensers . The <br /> owner or operator or an onshore or offshore facility subject to this section must prepare in writing and <br /> implement a Spill Prevention Control and Countermeasure Plan (hereafter "SPCC Plan" or " Plan" ) , " in <br /> accordance with § 1127 and any other applicable section of this part. Implement the SPCC plan as written <br /> or amend the plan to reflect actual facility procedures . <br /> This violation was corrected ❑ This violation will be corrected by (date) <br /> ❑ Supporting documents included /� _ <br /> Describe actions taken or will be taken to correct violation A PPEP i tb >: Rgs�, 6 D Riaz THS <br /> C.OA61 .yCo `UMi-oAt4 tj& 0, 9C4 AND 6? 1LL KITS Hi yF ge�FAV G ,P...QE14c o <br /> Violation #301 - Failed to amend Plan as necessary. <br /> The 500 gallon used oil aboveground storage tank described as being in the diked area next to the 10, 000 <br /> gallon diesel tank is no longer at the site and a square blue used oil tank outside of the diked area , near the <br /> oil water separator is not mentioned in the SPCC plan. The Spill Prevention , Control , and Countermeasure <br /> (SPCC) Plan must be amended when there is a change in the facility design , construction , operation , or <br /> maintenance that materially affects its potential for a discharge , within 6 months of the change , and <br /> implemented as soon as possible , not later than 6 months following preparation of the amendment. <br /> Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures and <br /> policies currently in place at the facility. p <br /> ❑ This violation was corrected This violation will be corrected by (date) ! / I ZG `L O <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation Wo R1V iJ & VJ i'rN PN EnIG ) n1lg�Ep- <br /> T-O cND pl_ ►AW -to ? 120Pe+eLYr"Zi✓ ru��s €N'r � � Wr124� <br /> ►4C l a ry sr ►4ry S <br /> Violation #302 - Failed to review Plan once every five years and/or implement any resulting <br /> amendments. <br /> The Spill Prevention , Control , and Countermeasure (SPCC) Plan was last reviewed on April 9 , 2011 . A <br /> review and evaluation of the SPCC Plan must be conducted at least once every 5 years . As a result of this <br /> review and evaluation , the SPCC Plan must be amended within 6 months of review , and recertified by a <br /> Professional Engineer if any technical amendments were made. Immediately conduct a review of the facility <br /> SPCC Plan and make any necessary amendments . <br /> Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.