Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations <br /> that have not been addressed for ESCALON UNIFIED SCHOOL DIST as of July 02 , <br /> 2020 . <br /> Open violations from July 16 , 2018 inspection <br /> ❑ This violation was corrected 4 This violation will be corrected by (date) <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation WG 2E /1%J THE Fol& 66w55 Or <br /> u p pykT' 1 N G TH E Rut +/\j 61&%) 0 Wiu- It�VC ! T sof lcDvL�l� I� iZ <br /> VRA)ER EVIEy1 iN "Il - FoTwzo!5 <br /> Violation #601 - Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> The Spill Prevention , Control , and Countermeasure ( SPCC) Plan does not follow the order or requirements in <br /> 40 CFR Part 112, and a cross- reference was not provided . If you do not follow the sequence specified in 40 <br /> CFR 112for the Plan , you must prepare an equivalent Plan and supplement it with a section <br /> cross- referencing the location of requirements in 40 CFR 112 and the equivalent Plan . Immediately amend <br /> the SPCC Plan to include a cross- reference or to follow the required sequence . a <br /> ❑ This violation was corrected 'his violation will be corrected by (date) I zD ! C) <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation E AJ EZ wi LL PJ20Vij)E CQ55 <br /> �c rE ( N� t✓ Fv �2 5 PC& <br /> Violation #603 - Failed to adequately describe the physical layout of the facility in the Plan . <br /> The facility diagram did not include buried piping and the locations of all regulated tanks was not accurate. <br /> The used oil tank inside the dike area has been removed. The Spill Prevention , Control , and <br /> Countermeasure ( SPCC) Plan shall include a facility diagram which must mark the location and contents of <br /> each fixed storage container and the storage area where mobile or portable containers are located . It must <br /> identify the location of and mark as "exempt" underground tanks . It must also include all transfer stations and <br /> connecting pipes , including intra-facility gathering lines . Immediately update the facility diagram to include <br /> all of the required information . Submit a legible copy of the updated facility diagram to the EHD for review. <br /> ❑ This violation was corrected This violation will be corrected by (date) ! %ZOV <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation <br /> Page 2 of 6 <br />