My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1721
>
2900 - Site Mitigation Program
>
PR0506625
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 11:36:44 AM
Creation date
7/27/2020 10:02:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506625
PE
2950
FACILITY_ID
FA0007550
FACILITY_NAME
CENTRAL VALLEY TITLE
STREET_NUMBER
1721
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20015025
CURRENT_STATUS
01
SITE_LOCATION
1721 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1721 WEST YOSEMITE AVENUE,MANTECA,CA SECOR Project No. 50178-001-01 <br /> 11. GENERAL SITE REQUIREMENTS AND BACKGROUND INFORMATION <br /> A. Health and Safety Plan Responsibilities <br /> Prior to beginning on-site work, the Project Manager will ensure Attachments 1-4 are <br /> completed. <br /> The Site Health and Safety Officer(SHSO)will ensure Attachments 5-8 are completed the <br /> first day of on-site work. Within 24 hours of the end of field work, the SHSO will submit the <br /> completed HASP to the Health &Safety Coordinator(HSC). <br /> The Site Health and Safety Officer will oversee the overall Plan. He/she has the authority to <br /> stop work or prohibit any personnel from working on the site at any time for not complying <br /> with any aspect of the Plan. <br /> The Subcontractor Field Supervisor is responsible for implementing the Plan for his/her own <br /> employees. <br /> • Each person on the site has responsibility for their own health and safety, as well as assisting <br /> others in carrying out the Plan. Any person observed to be in violation of the Plan should be <br /> assisted in complying with the Plan,or reported to the Site Health and Safety Officer or the <br /> Subcontractor Field Supervisor. <br /> Any site personnel may shut down field activities if there is a real or perceived immediate <br /> danger to life or health. <br /> B. Minimum Training,Respirator Fit-Testing,and Medical Surveillance Requirements for Site <br /> Personnel <br /> i <br /> 40 hr. Hazardous Waste Operations Training (HAZWOPER) <br /> • 8 hr.Annual HAZWOPER Refresher Training <br /> • 8 hr. Supervisor HAZWOPER Training for Site Health and Safety Officer <br /> • First Aid and CPR Training for Site Health and Safety Officer <br /> • Annual Respirator Fit Testing <br /> Annual Medical Clearance <br /> C. Purpose of Field Work: <br /> To further evaluate whether or not previous onsite and/or nearby offsite activities have adversely <br /> impacted soil and/or groundwater quality underlying the Site, SECOR will collect soil and <br /> groundwater samples for chemical analysis,as feasible. <br /> D. Detailed Description of Specific Tasks Planned(Number each separate task in order of progression. <br /> The task numbers assigned here will be referred to throughout the Plan): <br /> 1. Utility Clearance Site Walk Through "Tail-Gate" Safety Meeting <br /> 2. Drill and sample soil and groundwater with geoprobe for Site characterization. <br /> 3. Abandon boreholes with grout <br /> E. Initial Site Entry Has this been performed by SECOR?(YES/NO): NO If YES,describe: <br /> H:\KAISERWANTECA\H&SPLAN.RPT -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.