My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2900 - Site Mitigation Program
>
PR0507794
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 12:39:27 PM
Creation date
7/27/2020 10:15:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507794
PE
2950
FACILITY_ID
FA0007765
FACILITY_NAME
TOSCO MARKETING CO (UNOCAL/TOSCO)
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
02
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMERGENCY CONTACT LISTING <br /> Nature of Emergency Phone Number Alternate Phone Number <br /> Ambulance 911 <br /> Fire 911 <br /> Police 911 <br /> Poison Control Center (800) 346-592 (800) 342-9293 <br /> Office of Emergency <br /> Services 911 <br /> Chemical Spills (800) 424-880 <br /> Hospital (209) 825-350 911 <br /> Other Contingencies Pacific Environme tal Group, Inc. (916) 858-2350 <br /> 12.0 TRAINING REQUIREMENTS <br /> All personnel assigned to this project will be required to demonstrate that they have <br /> completed the Initial Training Requirements (40 ho irs), according to Federal OSHA <br /> Standards under 29 CFR 1910.120. <br /> Field personnel from PEG and their sub-contractors will attend a project briefing for safety <br /> issues and project work task review before beginning work. All PEG site personnel shall <br /> have completed training relative to the project operations plans, and the materials to be <br /> encountered during the project. <br /> 13.0 MEDICAL SURVEILLANCE <br /> PEG personnel and sub-contractors engaged in project operations shall be participants in the <br /> Medical Surveillance program, and must be cleared by the examining physician(s) to wear <br /> respiratory protection devices and protective clothir g for working with hazardous materials. <br /> The applicable requirements under Federal OSHA, 29 CFR 1910 will be observed. <br /> A. Examination Requirements <br /> a <br /> All PEG personnel on-site shall have successful) completed a pre-placement or periodic <br /> medical examination in accordance with established PEG policies and procedures, and <br /> consistent with the provisions of the OSHA carcinogen standards. This examination shall <br /> include a complete medical and occupational his ory, physical examination, and selected <br /> biological sampling. Laboratory studies include a complete blood count (CBC), urinalysis, <br /> i <br /> 14 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.