Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 5 of 6) <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section) F[FXK'l <br /> N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? El <br /> (Check all that apply.) Simulated leak rate verified : ❑X 3 GPH E] 0. 1 GPH El 0. 2 GPH <br /> Was the testing apparatus properly calibrated ? ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ XQ <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected ? Q ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected ? ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ X❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ XQ <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ 0 <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? 0 ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? z ❑ ❑ <br /> For any answer of "N" above, describe in Section Xlll how and when these issues v era2 or_ will:be corrected4 3- w . <br /> XIII . COMMENTS ; <br /> 13 �A q <br /> XIV. VACUUM / PRESSURE / HYDROSTATIC MONITO t - fl. 0,�M f T , , TING " <br /> k k , �_, i 'i. 1. <br /> ❑X Check this box if VPH monitoring is NOT used . (Do not complete this section) <br /> j This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> i <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Teionality Interstitial CT Smunication <br /> st r <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> El Pass El Fail ❑ Pass E] Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail I ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail I ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail I ❑ Pass ❑ Fail <br /> How was interstitial communication verified ? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below) <br /> For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = VacuumlPressure/Hydrostatic, ID = Identification <br />