Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 6 of 6) <br /> XVI , MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces orvault; 4) devices monitoring product piping,• 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> . . Monitoring System Certification _- <br /> i U ST Monitoring Site Pian - - <br /> - - - -- -- -- - - -- -- - - - - - - - - - - - - - - - - - -------- -- --- - ---- -------- -- - - - <br /> --- -- - - - - - - - - - - - - - - - <br /> RIVER <br /> - - - - - - - - -- - - - . - . - - - -- - -- -----'- ---- <br /> _ _ <br /> l RIVER POINT LANDING MARINA 4950 BUCKLEY COVE WAY STOCKTON , CA 95262 i <br /> *PIPING + — <br /> _ - - Drawing of Piping <br /> exit of sump and <br /> UDC'*. No <br /> - - - - - - - underground <br /> drzxxmlz is <br /> accurate, we <br /> cannot speculate <br /> S9 . . . blueprints. <br /> RD <br /> T <br /> . . . . . . . . . . . . . . . . . . . . <br /> RIVER <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> KEY <br /> . . . . . _ - A = APLN'ULAR <br /> F = FILLS <br /> T = TL'RBLNE. <br /> P = PROBE <br /> ` = VAPOR <br /> X = SUILP SENSOR <br /> L = LD <br /> jf= llfalavr . <br /> B = Brine Sensor <br /> . . . . . . . . I = Smart Sensor <br /> S — STP <br /> 89 Red Diesel . . . - c = Floats at Chains <br /> E —E stop <br /> i?W imms wtdarground Aunt are not vaible to the carr(f ng reolm:iciwi aro a <br /> prgfksional opinion orr& cold are sole[i�for bifor»mfiorlal purposes. Drinvi g <br /> not to scala <br /> Date map was drawn: t -23-1 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include n, rather than this page, with your Monitoring System Certification. On your site plant <br /> show dte general layout of tanks and piping. Clearly identify locations of the following equipment, iF installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak dateclors; and in-tank liquid level <br /> probes (if used for leak defection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />