My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BUCKLEY COVE
>
4950
>
2300 - Underground Storage Tank Program
>
PR0231028
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2021 1:56:26 PM
Creation date
7/27/2020 2:43:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231028
PE
2361
FACILITY_ID
FA0003811
FACILITY_NAME
RIVER POINT LANDING MARINA-RESORT*
STREET_NUMBER
4950
STREET_NAME
BUCKLEY COVE
STREET_TYPE
WAY
City
STOCKTON
Zip
95219
APN
11820001
CURRENT_STATUS
01
SITE_LOCATION
4950 BUCKLEY COVE WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax; (209)468-3433 Web:www.s'gov.org/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> RIVER POINT LANDING MARINA-RESORT* 4950 BUCKLEY COVE WAY, STOCKTON January 24, 2019 <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by February 23, 2019. <br /> Note: The monitoring system certification was conducted on 1/23/19. The paperwork inspection was completed <br /> on 1/24/19 (today). <br /> Note: The overfill prevention equipment inspection report lists the overfill level at 88.5 inches and the percent <br /> capacity to activate at 94% for the gasoline tank and 87 inches / 93% for the diesel tank. Incomplete tank charts <br /> were on site. The calculated percentages don't appear to coincide with the volumes on the tank charts. Verify <br /> that the accurate tank information is used to calculate the overfill prevention activation volume percentage and <br /> ensure that all mechanical overfill prevention devices (flappers) are located at or below 95%. <br /> Note: Line tightness testing could not be completed and is due by the end of the month. The testing has been <br /> scheduled for 1/30/19 at 12:00 PM. <br /> Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate($152). To schedule an <br /> appointment, please call (209) 468-3420. <br /> Documents provided: Return to Compliance Certification form, schedule of free CUPA classes, UST Statement <br /> of Understanding and Compliance form, Permit Guidance document <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE <br /> Received by: Date: January 24, 2019 Inspector: Inspector Phone: <br /> a2___ Printed Name and Title: STACY RIVERA, Senior REHS (209)468-3440 <br /> Andrew Rehberg, Harbor Master <br /> FA0003811 PR0231028 SCO01 01/24/2019 <br /> EHD 23-01 Rev.09/22/16 Page 5 of 5 Underground Storage Tank Program OIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.