My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2900 - Site Mitigation Program
>
PR0537485
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 3:42:55 PM
Creation date
7/27/2020 2:46:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537485
PE
2957
FACILITY_ID
FA0021568
FACILITY_NAME
FORMER RAINWATER CAR WASH
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21931206
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • • <br /> lohnst <br /> ' Multichannel Tubing Seals& Packers <br /> A multilevel well that uses a continuous length of The CMT tubing can be sealed in place with sand and <br /> multichannel tubing has the advantage over other bentonite layers in the usual manner using a tremie pipe <br /> multilevels in that there are no joints. This significantly or with the Solinst Mini Sand Bentonite Injector, Model <br /> ' reduces the cost of installing wells and at the same time 561M. If the application is in loose sands, direct burial <br /> increases the reliability of the system. The CMT tubing can be used, allowing the sand to collapse around the <br /> is very simple and convenient to use, as it gives full tubing. Pre-packed bentonite seals are also available <br /> flexibility m to where monitoring zones are located,and which have bentonite pellets inside a plastic mesh, so <br /> t one length of tubing can be used for a number of well that they can be slipped onto the tubing and then <br /> installations. It has a ridge down its entire length to clamped quickly in place prior to Installation. <br /> allow for easy identification of specific channels. <br /> Ports and packers can be assembled onto the tubing in <br /> ' the field,immediately after drilling,to reduce open hole <br /> time and potential cross-contamination between zones. <br /> Plan View of <br /> CMTTubbingang <br /> CMT T <br /> ' Pre-packed Bentonite Packer Double-Acting Packers . <br /> Ridge Double-Acting Inflatable Packers' are ideal for use in <br /> ' - situations where a CMT System is to be put inside an <br /> tri existing casing,or in a smooth rock borehole and when <br /> Pon Inlet Holes removal of the system for decommissioning or reuse is- <br /> important. <br /> w R Double Acting Packers have a rubber gland on the inside <br /> as well w the outside. Both glands inflate and deflate at <br /> Polyethylene the same time. When a vacuum is applied to a packer, <br /> Hot Met Seal i the inner gland retracts and the packer slides easily into <br /> ' Foam Plug position on the CMT tubing. <br /> Air vent Hole The vacuum is then released so that the packer grips <br /> onto the tubing and a clamp top and bottom ensures <br /> ' that the packer does not shift position during installation. <br /> To create a port:channel is sealed,holes are drilled into <br /> the tubing and covered by a stainless steel screen or �. ;„ <br /> pre-packed sand pack ��` <br /> ' Ports <br /> u <br /> The number and location of ports may be determined in "� �1. s <br /> advance of drilling,or after coring. Holes are drilled in <br /> a vertical line into a given channel at a specified depth , .:, . <br /> ' according to the zone to be monitored, forming a port. <br /> The channel is sealed with a polyethylene sealant below IF <br /> the port openings and a vent hole is left just below the <br /> seal to allow air to escape as the system is lowered into <br /> ' the hole. Inflating the <br /> A stainless steel mesh is fixed in place over the port to Applying a Sliding the packer Double-Acting <br /> prevent fines from entering, or pre-packed sand packs MCI$ ^ into position Packers <br /> are clamped onto the tubing over the holes.The screen The packers are connected in fine with flexible inflation <br /> ' kits come in a variety of mesh sizes, complete with tubing, and after installation into the well an inflation <br /> clamps, hot melt polyethylene glue and plugs. vessel is filled with water and an air source is used to <br /> Each channel is sealed at the bottom to prevent cross hydraulically inflate the packers. <br /> contamination, and a vent hole is cut into the channel Systems using Double Acting Packers can easily be <br /> ' just below the port. This allows water from the removed and the packers used elsewhere or in some <br /> monitoring zone to fill the channel below the zone, cases the system may be repositioned so that the ports <br /> avoiding buoyancy. are located at different depths within the same well. <br /> Patents Pending <br /> High Quality Groundwater Monitoring Instrumentation swffint <br />
The URL can be used to link to this page
Your browser does not support the video tag.