Laserfiche WebLink
1 • • <br /> Solinst <br /> ' Installation Overview Monitoring Your CMT Multilevel <br /> There are many options for the installation of a CMT System Water levels can be accurately established using the Solinst Mini <br /> depending on the lithology and project requirements. Typical 101 Water Level Meter. The Mini 101 is ideal for use in shallow <br /> installation options include: CMT Systems. Lengths of 30 ft, 65 ft, 10m or 20m. of the <br /> ' • Consolidated Boreholes (Bedrock) narrow 1/4"(6 mm)tape are mounted on a convenient small <br /> Zones may be isolated with: reel. A narrower Model 102 coaxial cable Water Level Meter <br /> a) Double-Acting Packers for 3"(75 mm)diameter or larger may be easier for use in deeper CMT Systems. <br /> boreholes <br /> b) Sand and bentonite layering,tremied or injected <br /> c) Pre-formed Bentonite Packers for 3"(75 mm)diameter <br /> or larger boreholes u, <br /> • Unconsolidated Sediments IOverburdenl <br /> ' Install the CMT System: <br /> a) using sediment collapse around tubing, in collapsing <br /> formations using 2" (50 mm)or larger drive casing <br /> b) within well casing, with screened intervals at the desired <br /> ' monitoring zones,and using options for consolidated holes <br /> c) within driven temporary casing or hollow stem augers: Solinst#410 Peristaltic Pump <br /> -using sand and bentonite layering, tremied or injected An accurate 1/4"(6mm) <br /> -using pre-formed bentonite packers and screens flat tape and probe. <br /> ' Temporary casing has the advantage that it avoids redistribution Sampling can be performed using the Solinst Model 410 <br /> of soil and contaminants and thus potential positive biases. Air Peristaltic Pump, a small inertial WaTerra Pump, or a single <br /> rotary, cable tool, sonic and large direct-push(DP)rigs.can all valve pump. <br /> ' be used to advance temporary casing. The smaller sonic and <br /> direct-push rigs also offer easy-access advantages. CMT System Sizes <br /> The tubino is available in lengths of 100',200'&300' (30m, <br /> ' 60m and 90m). If deeper multilevels are desired the Waterloo <br /> Multilevel System can be considered. (See Data Sheet 401.) <br /> The 1.7" O.D. CMT tubing(43.2 <br /> mm)has 7 channels Although not <br /> ' r circular, the ID of the 6 outer <br /> channels are approximately 7/16" <br /> (11mm) and the smaller central <br /> channel is 3/8" (9.5mm). The <br /> ' tubing coils are approximately 4 ft. <br /> (1.22 m)in diameter. <br /> A support stand eases The fully prepared CMT When a CMT System is to be <br /> the preparation of ports. System is lowered into installed through narrow dialn ete <br /> ' the hole. direct push equipment using direct <br /> burial with formation collapse <br /> Typical Installation Procedures around the system,the port screens <br /> can be held in place using low <br /> The CMT Multilevel is completely built above ground and then profile clamps. These give an <br /> inserted into the borehole. A set of appropriate installation overall diameter of 1.75" (44.45 <br /> tools is available to suit each CMT System. A support stand is mm) to the 1.7" system. The <br /> recommended to hold the tubing in a convenient position while regular clamps give an overall <br /> the ports are drilled and sealed. diameter of 1.9"(48.26 mm)when <br /> Installation is simple. After drilling the hole, lay out the CMT packers or sand packs are not used. <br /> tubing, mark the zones to be monitored and prepare the port Pre-packed bentonite packers and <br /> inlet holes. If packets and/or sand packs are to be used, slip Double-Acting Packers are <br /> ' them into position. When sand packs are not to be used, available in a variety of diameters <br /> screens are placed over the port inlet holes, to suit different sized holes. <br /> The CMT System can then be lowered into the hole. Double- MT tubing is layed out Pre-packed sand packs are <br /> Acting Packers are inflated or time is given to allow Pre-formed CMT <br /> ground or plastic available with different sizes of <br /> ' Bentonite Packers to expand, and monitoring can begin as on sheeting for ports to be screen mesh and different sizes of <br /> soon as hydraulic and hydrogeochemical equilibrium has been prepared and placement sand, to suit hydrogeologic <br /> re-estabished. ofpackers. conditions. <br /> ' High Quality Groundwater Monitoring Instrumentation <br /> Solinst <br />