Laserfiche WebLink
1 • • <br /> Off-Site Groundwater Investigation Work Plan Page 1 <br /> Rainwater Car Wash,Manteca, California 95336 <br /> May 30, 2012 <br /> 1 1. INTRODUCTION <br /> ' Ami Adini&Associates,Inc. (AA&A)prepared this Off-Site Groundwater Investigation Work Plan for the <br /> Rainwater Car Wash located at 420 West Yosemite Avenue in Manteca,California 95336,and hereinafter <br /> referred to as the site(Figure 1,Figures section). <br /> 1.1 Objective <br /> The objective of this work plan is to propose the installation of three dual-nested groundwater monitoring wells to <br /> further evaluate the lateral extent of the off-site groundwater contaminant plume.This work plan was prepared in <br /> response to the request from the California Regional Water Quality Control Board,Central Valley Region <br /> ' (CVRWQCB)as stated in a letter dated February 27,2012(Appendix A). <br /> 1.2 Scope of Work <br /> ' The scope of work for this work plan includes: <br /> • Preparation of a site-specific Community Health and Safety Plan (CHSP); <br /> ' • Installation of three dual-nested groundwater monitoring wells to 30 and 70 feet bgs each with 2-inch <br /> diameter casings; <br /> • Preparation of an off-site assessment report detailing the procedures,findings, and interpretation of data, <br /> reviewed and approved by a California Professional Geologist(PG). <br /> • Submittal of the report to the CVRWQCB and upload to the California Environmental Protection Agency <br /> State Water Resources Control Board GeoTracker online database. <br /> 1 2. SITE DESCRIPTION <br /> ' The site is located at 420 West Yosemite Avenue, at the southeast corner of Yosemite Avenue and Jessie Avenue <br /> in a topographically flat area at an elevation between 30 and 35 feet above mean sea level(MSL)in Manteca, San <br /> Joaquin County,California. <br /> ' The site is presently operated as a fueling facility and a mini-market. One 10,000-gallon underground storage tank <br /> (UST),one 6,000-gallon UST and one 4,000-gallon gasoline UST were formerly located on a west section of the <br /> ' property. Additionally,a car wash was formerly located on a south section of the property. According to the State <br /> Water Resources Control Board UST Cleanup Fund 5-Year Review Summary dated December 23,2010,three <br /> USTs(one 10,000-gallon,one 6,000-gallon,and one 4,000-gallon gasoline)currently operate on-site. Previous <br /> t reports detail one 15,000-gallon gasoline UST operating at the site.AA&A believes at least two USTs are <br /> currently operating at the site. Site details are presented in Figure 2. <br /> A groundwater extraction remediation system is located in the southeast section of the site and consists of an <br /> ' electric control panel,one 1,000-gallon holding tank,one process pump,and four 2,000-pound,dissolved-phase <br /> carbon media vessels. The remediation system has remained shut-down since the last pump and treat event <br /> terminated on March 23,2010. <br /> ' Ami Adin <br /> &AssocYates.Vue. <br />