Laserfiche WebLink
' Community Health and Safety Plan <br /> RAINWATER CAR WASH,Manteca, California 95336 Page 16 <br /> May 30,2012 <br /> ' For areas where chemical hazards are suspected,the first person entering the work zone will carry the appropriate <br /> instrument and monitor concentration levels in the work area before anyone else is allowed into the work zone. <br /> Thereafter,periodic and ongoing air monitoring will be conducted during the following site operations in the <br /> ' work zone and for personnel likely to have the highest exposures to the COCs:drilling and sampling. <br /> The table below summarizes the various gasoline-related hydrocarbon vapor criteria and appropriate responses to <br /> t potential vapor hazards. Certain components,such as benzene vapors,present significant hazards and must be <br /> properly controlled. Criteria for the use of respiratory protection are based on preventing potential exposures to <br /> benzene. <br /> ' Hydrocarbon Vapor Criteria and Response <br /> Total Hydrocarbon Concentrations above Background Levels Response <br /> (parts per million by volume [ppmv]as measured by PID) <br /> ' <30 ppmv total hydrocarbon concentration (THC), verify Limited hazard, no special action. <br /> that benzene concentration is below 1 ppm <br /> 30-100 ppmv THC for more than two minutes in general Stop work, move upwind, monitor perimeter or don <br /> ' work area level C (half-face organic vapor respirator with P- <br /> 100 filter)and continue work or wait until levels <br /> decrease. <br /> ' 100-900 ppmv THC in general work area Wear full-face organic vapor respirators with PA 00 <br /> filter in work area. <br /> >900 ppmv THC in general work area Stop work; procedures must be implemented to <br /> subdue excessive vapor levels. <br /> 7. PROJECT SAFETY PERSONNEL <br /> ' 7.1 Project Manager <br /> ' The PM is an AA&A employee who has the responsibility and authority to direct all site operations covered under <br /> this HSP.The PM has the authority to discipline personnel under his/her direction/control and the authority to <br /> shut down or stop any site operation under his/her direction/control.In general,the PM is responsible for the <br /> ' following: <br /> • To ensure that a comprehensive SAP Addendum has been prepared which addresses the tasks and <br /> ' objectives of the site operations and the logistics and resources required to reach those tasks and <br /> objectives; <br /> • To document all work progress; <br /> • To execute the site work plan and HSP; <br /> • To ensure that a HSP has been prepared for all appropriate site operations; <br /> • To ensure that the SHSS has been designated and is on site during all site operations covered by this HSP; <br /> ' • To take appropriate action in consultation with the SHSS, upon becoming aware of any deficiency in the <br /> implementation of HSP; <br /> • To become the incident commander during any site emergency until relieved by the appropriate chain in <br /> command. <br /> In the event that the PM becomes aware of a deficiency in the implementation of the HSP,he/she will take <br /> ' appropriate action by consulting with the SHSS. <br /> AmiAdini <br /> ' W&Associates,Inc. <br />