Laserfiche WebLink
• <br /> ' 4.0 CONCLUSIONS AND RECOMMENDATIONS <br /> ' Soil exceeding residential cleanup goals was excavated and disposed offsite between February <br /> 21 and June 8, 2017. A total of 1,184.09 tons of soil exceeding RCRA hazardous waste criteria <br /> and 1,701.48 tons exceeding California hazardous waste criteria were transported to Clean <br /> Harbors under appropriate manifest documentation. Final site grading was completed June 17, <br /> 2017. <br /> Residential cleanup goals were utilized to allow for unrestricted Site use upon completion of the <br /> ' proposed remedial activities. Proposed remedial activities have been completed and Pacific <br /> Edge requests that the SJCEHD issue a certificate of completion for the Site pursuant to <br /> ' California Health and Safety Code Section 101480(e). <br /> 1 <br /> 5 Closure Reportjmal.doc <br /> PACIFIC EDGE ENGINEERING <br /> (949)470-1937;(949)470-0943(FAX) <br />