My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1985
>
2900 - Site Mitigation Program
>
PR0543949
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 6:28:30 PM
Creation date
7/27/2020 4:22:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543949
PE
2960
FACILITY_ID
FA0024995
FACILITY_NAME
TED PETERS TRUCKING COMPANY
STREET_NUMBER
1985
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
20014019
CURRENT_STATUS
01
SITE_LOCATION
1985 W YOSEMITE AVE
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DETECTION LIMITS <br /> 04/20/1998 <br /> ANALYTICAL DETECTION LIMIT DETECTION LIMIT <br /> METHOD (SOIL) (WATER) <br /> TPH/GASOLINE 1.0 PPM 50 PPB <br /> i <br /> B.T.X.E. 0.005 PFM 0.3 PPB <br /> LEAD 2.5 PPM 0.1 PPM <br /> OXYGENATES :.:._:::::...,....,..:..:...........::...:.: .:•:..:: :..:.:.........: .::._.:.:...:.:.. ............ <br /> MTBE f 100 FPB 20 PPB <br /> DIPE / 100 PPB 20 PPB G <br /> TAME / 100 PPB 20 PPB <br /> ETBE 100 PPB 4 20 PPB <br /> TBA 100 PPB 20 PPB <br /> All decontamination water or purge water will cont ined in DOT 17 of drums and stored on <br /> P g � poly <br /> site until proper disposal methods are determined. <br /> The water purging/sampling event will be completed by Del-Tech and a detailed Field Sampling <br /> Summary Log will be completed during those activities. <br /> i <br /> After completion of the soil boring to a depth sufficient enough to allow the installation of the <br /> temporary two inch PVC casing, the pumping / purging of the temporary well casing will be <br /> completed to remove any fines and or sediments encountered during the installation. This will <br /> also establish a efficient conduit for the monitoring of he first groundwater interface. <br /> A detailed field sampling log will be initiated for each monitoring point. The purging activities <br /> will be completed with a Honda centrifugal pump arid the pH, Temperature, on uctivity and <br /> Visual Turbidity will be monitored with calibrated field instruments. Next, the temporary well <br /> will be sampled with a clean teflon or stainless steel bailer when the effluent water from the <br /> pump is clear. The temporary well will then be allowcd to stabilize for approximately 1 hour. <br /> Prior to sampling, a bailer blank sample will be collected by pouring distilled water into the <br /> bailer and collecting one VOA for Quality Control measures. Then four VOA's will be collected <br /> TED PETERS TRUCKING/MAISFIFECA WORKPLAN <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.