My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 11:06:05 AM
Creation date
7/28/2020 9:15:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q lJ I N Environmental Health Department <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name : Facility Address : Date : <br /> DSS COMPANY 655 W CLAY ST , STOCKTON July 26 , 2019 <br /> File Review <br /> 123 CCR 2637 . 1 (d ), Failure to submit the "Spill Container Testing Report Form" within 30 days after the test ❑ V ❑ R ❑ COS <br /> 2637. 1 (e) <br /> 124 CCR 2637.2(d&e), " Overfill Prevention Equipment Inspection Report Form" not submitted within 30 days of inspection ❑ V ❑ R ❑ COS <br /> 2665 a&b <br /> On Site Records <br /> 201 CCR 2712(b)(1 -2) Failure to maintain monitoring , maintenance , and follow up action records ❑ V ❑ R ❑ COS <br /> 202 CCR 2715(c)(3), 2715(c Failure to maintain the "Facility Employee Training Certificate" on-site (after October 1 , 2018) ❑ V ❑ R ❑ COS <br /> 4 <br /> 203 CCR 2712(b) Failure to maintain records of repairs , lining , and upgrades on site , forthe life of the UST ❑ V ❑ R ❑ COS <br /> 204 CCR 2712(i ) Current monitoring plan approved by the EHD not found on site ❑ V ❑ R ❑ COS <br /> 205 CCR 2712(i ), 2634(e) Failure to submit a current UST Response Plan and have it available onsite ❑ V ❑ R ❑ COS <br /> 206 CCR 2712 Failure to comply with UST operating permit conditions ❑ V ❑ R ❑ COS <br /> 207 HSC 25294 Failed to record unauthorized release from primary containment ❑ V ❑ R ❑ COS <br /> 208 CCR 2650(e), 2652 Failed to notify the EHD of a reportable unauthorized release and/or prepare a report ❑ V ❑ R ❑ COS <br /> 209 CCR 2716(a e) Failure to conduct the designated UST operator visual inspection at least once every 30 days ■ V ❑ R ❑ COS <br /> 210 CCR 2716(f) DO monthly reports not maintained on site for 12 months or for 36 months (after October 1 , 2018) ❑ V ❑ R ❑ COS <br /> 211 CCR 2715(c)(2) No employee present that were trained in the operation and maintenance of the UST system by a DO ❑ V ❑ R ❑ COS <br /> 212 CCR 2715(f)(2) Unstaffed facility failed to have or implement a training program approved by the EHD ❑ V ❑ R ❑ COS <br /> 213 HSC 25281 .5(b)(2) Unburied fuel piping at marinas not visually inspected at least daily or log not kept ❑ V ❑ R ❑ COS <br /> 214 HSC 25281 .5(b)(3) Unburied emergency generator fuel piping not visually inspected at least monthly or log kept ❑ V ❑ R ❑ COS <br /> 215 CCR 2712(i ) Failure to retain a copy of the permit to operate at the facility ❑ V ❑ R ❑ COS <br /> UST System Observations <br /> 301 HSC 25292 . 1 (a) UST system is not operated to prevent unauthorized release, including spills and overfills ❑ V ❑ R ❑ COS <br /> 302 HSC 25291 (b) UST system incapable of detecting leak from primary into secondary containment (pre-Jul 2003) ❑ V ❑ R ❑ COS <br /> 303 HSC 25290.2(d) Monitoring system not maintained to detect entry into secondary containment (Jul 2003-Jun 2004) ❑ V ❑ R ❑ COS <br /> 304 HSC 2529091 (d) Monitoring system not maintained to detect entry into secondary containment (after Jul 2004) ❑ V ❑ R ❑ COS <br /> 305 HSC 25290. 1 (e) VPH monitoring of the interstitial spaces of the UST system is not maintained ❑ V ❑ R ❑ COS <br /> 306 CCR 2630(d )2 2641 (a) Monitoring equipment is not installed or maintained to detect a leak at the earliest opportunity ❑ V ❑ R ❑ COS <br /> 307 CCR 2631 (g), 2632(c) Monitoring system of the interstitial space of a double walled system not maintained ❑ V ❑ R ❑ COS <br /> 308 CCR 2632(c), 2634(d), Failed to maintain a continuous monitoring system that activates an audible and visual alarm ❑ V ❑ R ❑ COS <br /> 2636 <br /> 309 CCR 2636(f)(1 ) Monitoring in sump / UDC failed to activate an audible and visual alarm or stop the flow product ❑ V ❑ R ❑ COS <br /> 310 CCR 2636(f)(4) Piping is not fail-safe outside UDCs or fails to stop flow of product at dispenser inside UDCs ❑ V ❑ R ❑ COS <br /> 311 CCR 2638(a), 2641 Q) Failed to properly program , calibrate , operate , or maintain leak detection equipment ❑ V ❑ R ❑ COS <br /> 312 CCR 2638(f), 2641 (1) Failed to affix a tag sticker on monitoring equipment certified , repaired , or replaced ❑ V ❑ R ❑ COS <br /> 313 HSC 25290 . 11 25290 .21 Failure to construct, operate , and maintain primary containment as product-tight ❑ V ❑ R ❑ COS <br /> 25291 <br /> FA0003699 PR0231065 SCO01 07/26/2019 <br /> EHD 23-01 Rev. 09/28/2018 Page 2 of 4 Underground Storage Tank Program OIR <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 T 209 468-3420 F 209 464-0138 1 www . sjcehd . com <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.