My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 9:36:52 AM
Creation date
7/28/2020 9:36:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN10 A Q U I N Environmental Health Department <br /> COUNTY H �p <br /> t� <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> TESORO (Shell)68221(WRR 6290) 2705 COUNTRY CLUB BLVD, STOCKTON May 07, 2019 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item # Remarks <br /> 320 CCR 2635, 2637.2, 2665, 2712 Failure to comply with the installation, inspection, or record keeping of the overfill <br /> prevention. <br /> The 87 and diesel mechanical flappers used as the overfill prevention system were marked as failures on the <br /> 10/08/18 Overfill Prevention Inspection Results. <br /> All UST systems must be equipped with an approved, functional overfill prevention device at all times during fuel <br /> deliveries. The failed components must be repaired or replaced by a properly licensed, trained, and certified <br /> contractor under permit and inspection of the EHD. If the failed component can't be replaced immediately, there is a <br /> possibility that the 87 and diesel UST systems may be red tagged to prevent fuel inputs. <br /> Overfill prevention testing for the ATG probes have not been conducted. The tank forms state the ATG probes and <br /> flappers are being used for overfill prevention. This testing was required to be conducted by October 13, 2018. <br /> immediately schedule this testing and provide 48 hours notification to the EHD. Ensure all future testing is conducted <br /> within required time frames. <br /> The overfill prevention test results for 10/08/18 include incorrect and missing information. <br /> -The results did not include manufacturer inspection procedures and tank charts. <br /> -The results indicate 25 pages were attached. No attachments were included. <br /> -The results incorrectly state vent piping is secondarily contained. <br /> -The results incorrectly mark"restricts flow". Mechanical flappers are shut off valves. <br /> -The tank inside diameter was left blank. <br /> -The inches from bottom of tank equals the percent capacity at which overfill activates. <br /> Test result forms must be fully and accurately completed and submitted to EHD within 30 days of testing. <br /> Immediately update these test results to include all of the required information, maintain a copy of the updated results <br /> on site, and submit a copy to the EHD. <br /> This is a Class II violation. <br /> Overall Inspection Comments: <br /> The monitoring system certification was conducted on 05/07/2019 and was not witnessed by EHD. Looked inside <br /> all sumps and UDCs. Verified sensor locations and piping communication. Verified spill bucket 5 gallon capacity. <br /> The paperwork inspection was conducted later in the day on 05/07/2019. <br /> An inspection checklist was provided to the facility operator on the day of inspection. The EHD has written the <br /> complete report which replaces the initial checklist. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> Documents provided: Return to Compliance Certification form, scheduled of free CUPA classes. <br /> FA0002048 PR0231072 SCO01 05/0712019 <br /> EHD 23-01 Rev.09/28/2018 Page 6 of 7 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-34201 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.