Laserfiche WebLink
REUWVtU <br /> !\! gV 18 2013 <br /> The fittings listed and illustrated here are common examples of kwa4installed in your Bravo <br /> B -2000 series shallow steel UDC ' s . In many cases 8Hfg1wIR6g Tor0ipe or conduit that they <br /> were not designed for. Read every scenario below gas the� valuable tips , warnings and <br /> instructions . Some may apply broadly. Bravo does not make any requirements for which combinations <br /> are acceptable , nor does Bravo specify any heights , elevations or measurements for adjustments . <br /> FR = ES1 RETROFIT <br /> FEF - EBS CONDUIT FITTING <br /> For this fitting , remove the existing boot & clamps , clean the <br /> y - ' contact surfaces of any/all contaminants , abrade the contact <br /> surfaces of both pipes and install the FR - ES1 split FRP sleeve <br /> I centered over both diameters . You can pack the interior of the <br /> - steel coupler with foam cord or other material first . Then pack <br /> s each half with Bravo epoxy, join them together and secure with <br /> clamps to cure . Bead with vulkem where it contacts the floor. <br /> FR = MYE = 5 RETROFIT <br /> MYERS HUB ( MYE ) CONDUIT <br /> FITTING For MYE ' s , clean the exterior of the fitting <br /> and sand the epoxy paint off of the steel floor about 1 " out <br /> from its outer diameter. Apply Bravo epoxy to interior of <br /> FR- MYE- 5 split FRP sleeve and install over the MYE fitting <br /> with clamps . Ensure it is completely encapsulated with no <br /> trapped air. Then apply a generous bead of vulkem to the <br /> outside of the FRP sleeve where it contacts the floor. Be <br /> sure to re - coat any steel that was exposed from sanding / <br /> cleaning . Just above it , where commonly another pipe <br /> protrudes through and a conduit comes through that pipe , <br /> follow the FR- ES1 retrofit directions above to seal these <br /> two pipes to each other. <br /> BH - 1 ® 1 /2 VAPOR FITTING <br /> Clean the exterior surfaces of the fitting and repeat the <br /> instructions listed above for the Myers Hub fitting . It is <br /> common for a vapor shear valve to be threaded directly <br /> onto this type of fitting . If so , then the FR- MYE -5 should <br /> apply, but if there is a nipple above , then the FR- ES1 may <br /> also be needed . It is detailed below and shown on the left . <br /> ' In the case where this fitting was instead used as a conduit <br /> entry, ( as shown ) first install the FR- ES1 to the top - most <br /> part of the threads and the conduit that protrudes through . <br /> 2 ii - B2000 - RETR0FIT- KIT- 14A <br />