Laserfiche WebLink
Environmental Hea <br /> SANJAQUIN <br /> COUNTY <br /> ction Report <br /> . Underground Storage p p <br /> 9 , <br /> Facility Address: Date: <br /> Facility Name: �351 N BECKMAN RD, LODI June 26,2019 , <br /> VAN DE POL ENT INC/PACIFIC PRIDE <br /> SWMAR ATIONS {�� oa <br /> S I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks ` y <br /> 206 CCR 2712 Failure to comply with UST operating permit conditions. ~`� <br /> A copy of the UST operating permit was not found on site. A copy of the UST operating permit and all attachments <br /> and conditions shall be retained at the facility. Immediately obtain a copy of the permit and retain it on site. <br /> qac <br /> This is a repeat violation,Class It. <br /> 209 CCR 2716(a-e)Failure to conduct the designated UST operator visual inspection at least once every 30 days. <br /> The designated operator failed to document one or more of the following: <br /> On the 10/25/18, 11/16/18, 12/16/18,2/13/19, 3/13/19,4/11/19, 5/10/19, and 6/7/19 designated operator(DO) P <br /> inspection report under <br /> -Section III <br /> The DO failed to add a description to all the components marked N/A or N from section VII through XI. <br /> -Section V <br /> The owner/operator failed to provide explanation of follow-up actions that will be taken for the statement provided by <br /> the DO in section III. <br /> -Section VII <br /> The DO fail to mark yes or No for the question"Has each follow-up action of section III from the previous inspection <br /> been completed appropriately?" <br /> -Section VIII <br /> The designated operator failed to attached documentations as required by this section. <br /> The DO failed to mar YES, NO or N/A under the question"Has the tank tightness testing been completed within <br /> required timeframes?"and"Has the line tightness testing been completed within the required timeframes?" <br /> -Section IX <br /> The DO failed to check if all containment sumps that have had a leak detection alarm since the previous inspection <br /> and have not been responded to by a qualified UST service technician. <br /> -Section X <br /> The DO failed to mar YES, NO or N/A under the question"Has the tank tightness testing been completed within <br /> required timeframes?"and"Has the line tightness testing been completed within the required timeframes?" <br /> Furthermore the DO failed to check that L2-91 fill fuel alarm on 11/30/18 and 5/15/19, L8-87 STP fuel alarm on <br /> 12/17/18 and L5-Diesel AB fill fuel alarm on 3/2/19, and 5/18/19, L6-Red diesel fuel alarm on 1/11/19 were <br /> responded to appropriately. <br /> During the designated operator inspection, the designated operator shall review the alarm history for the previous <br /> month, check that each alarm was documented and responded to appropriately, and attach a copy of the alarm <br /> history with documentation taken in response to any alarms to the monthly report. Ensure that designated operators <br /> performing inspections at least once every 30 days at this facility and are including all of the required information on <br /> the reports. <br /> This is a repeat violation, Class II. <br /> FA0003773 PRQ23131Q SCOM Q6116170t9 <br /> EHo 23-01 Rev.09/28/2018 Page 6 of 8 Underground Storage Tank Prowwa Ctlft <br /> 1868 E. Hazelton Avenue Stockton, California 952051 T 209 468-3420 F 209 464-0138 1 www,BJCehd.WM <br />