Laserfiche WebLink
6. If parking is required, the parking spaces will be required to accommodate persons with <br /> disabilities in compliance with Chapter 11 B of the California Building Code. Note that accessible <br /> parking spaces are required for each phase of the project. These parking space(s) shall be <br /> located as close as possible to the primary entrance to the building. <br /> 7. This project will be required to comply with the Model Water Efficient Landscape Ordinance <br /> requirements of the California Code of Regulations, Title 22, Division 2, Chapter 2.7 <br /> h. FIRE CODE REQUIREMENTS: The following 2019 California Fire Code (CFC) requirements will <br /> be applicable to the proposed project.The following conditions shall be addressed prior to submittal <br /> of a building permit application to the Building Inspection Division. <br /> 1. CFC 507 Fire Protection Water Supply-Fire flow and hydrants shall be provided for the <br /> proposed project by the use of: CFC Appendix B. <br /> 2. If Fire Protection Systems are required they shall be installed according to the CFC, Chapter 9 <br /> and the appropriate standards and guides adopted in Chapter 35 of the California Building <br /> Code and the California Electrical Code. <br /> 3. CFC, Section 503 Fire Apparatus Access Roads-Shall be provided as required by this section. <br /> 503.1.2-A secondary access may be required. <br /> 4. CFC, Section 906 Portable Fire Extinguishers-Provided portable fire extinguishers as required <br /> by this section. <br /> 5. CFC, Section 506 Key Box- A Knox Box® shall be installed according to the local fire <br /> department's instructions. Make application for the key box at the fire district having jurisdiction <br /> of this project. If there is an electronically controlled access gate at this site a Knox®key switch <br /> will also be required. <br /> 6. CFC, Section 5001.3.3.1 Properties of Hazardous Materials- A complete list of hazardous <br /> materials used and or stored at this site shall be provided. <br /> 7. A complete review, at building permit submittal, will require compliance with applicable codes <br /> and ordinances. <br /> 8. CFC, Section 105 Permits: Operational Permit(s) may be required prior to occupancy. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209]468-3000, see memo dated July 24, 2020) <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT (Contact: [209] 468-3420, see memo dated August 12, <br /> 2020) <br /> 4. SAN JOAQUIN COUNCIL OF GOVERNMENTS (Contact Staff: [209] 235-0600, see memo dated July <br /> 23, 2020) <br /> 5. AIRPORT LAND USE COMMISSION (Contact Staff: [209]235-0452, see memo dated August 5, 2020) <br /> FOR NOTES AND INFORMATION ONLY: <br /> Seethe Buena Vista Rancheria response dated August 6, 2020. <br /> See the Farm Bureau response dated July 24,2019. <br /> PA-1900132 — Conditions of Approval 3 <br />