Laserfiche WebLink
SANJ O A O U I N Department of Public Works <br /> Fritz Buchman, Interim Director of Public Works <br /> COUNTY " i <br /> Alex Chetley,Interim Deputy Director/Development <br /> Worldng fb. YOU Jim Stone,Deputy Director/Operations <br /> Najee Zarif, Interim Deputy Director/Engineering <br /> Kristi Rhea,Public Works Business Administrator <br /> July 24, 2019 <br /> MEMORANDUM <br /> TO: Community Development Department <br /> CONTACT PERSON: Teddie Hemandez <br /> FROM: Jayna Rutz, Interim Engineering Services Managera� <br /> Development Services Division <br /> SUBJECT: PA-1900132; A Site Approval application to establish an unmanned, 25 <br /> megawatt (MW) battery energy storage system facility utilizing 2.2 acres of a 4.8 <br /> acre parcel to include thirty-eight(38) storage containers totaling 12,160 square <br /> feet to house battery storage racks for lithium batteries; one (1) auxiliary battery <br /> storage container; sixteen (16) inverters/transformers totaling 1,920 square feet <br /> to convert between AC and DC and to step up the voltage; and one (1) site <br /> substation totaling 5,940 square feet; located on the south side of East Carpenter <br /> Road, 475 feet east of South Pock Road, Stockton. (Supervisorial District 1) <br /> PROPERTY OWNER: Estrella L. Jose LP APPLICANT: Cascade Energy Storage, <br /> LLC <br /> ADDRESS: 2482 E. Carpenter Road, Stockton APN: 179-140-18 <br /> INFORMATION: <br /> The site is currently not located within a Federal Emergency Management Agency Designated <br /> Flood Zone. <br /> The site is within the Phase 2 area of the National Pollutant Discharge Elimination System <br /> (NPDES). <br /> Carpenter Road has an existing right-of-way width of 55 feet and a planned right-of-way width of <br /> 60 feet, 30 feet from centerline of the road. <br /> RECOMMENDATIONS: <br /> I. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. (Resolution R-00-433) <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br /> L1 Follow us on Facebook @ PublicWorksSJC Visit our website: www.sjgov.org/pubworks <br />