My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 9:02:04 AM
Creation date
7/29/2020 2:08:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run # 1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Poly Co-Flex Poly Co-Flex Poly Co-Flex Poly Co-Flex <br /> Piping Manufacturer: Environ/*OPW Environ Environ/*OPW Environ <br /> Piping Diameter: 1 %2" 1 %" 1 '/2" 1 ''/z" <br /> Length of Piping Run: Approx. 120' Approx. 100' Approx. 100' Approx. 120' <br /> Product Stored: Regular 87-West Regular 87-East Super 91-West Super 91-East <br /> Method and location of Test Boot at Test Boot at Test Boot at Test Boot at <br /> piping-run isolation: STP Piping Sump#1 STP Piping Sump#1 STP Piping Sump#2 STP Piping Sump#2 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:00 10:00 10:05 10:05 <br /> Initial Reading(Ri): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time: 11:00 11:00 11:05 11:05 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R,): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Clamps on Test boot in all UDC's,loosened at end of testing,to allow earliest detection if a primary pipe leak occurs. <br /> *Note: Product Piping between UDC's 11&12,#11 side to UDC#7&8,#8 side is OPW Poly Co-Flex Manufacture. <br /> All other Product Piping at this UST Facility is,Environ Poly Co-Flex Manufacture. <br />
The URL can be used to link to this page
Your browser does not support the video tag.