My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 9:02:04 AM
Creation date
7/29/2020 2:08:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure -1 Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> u Sump# 1-87 Sump#2-91 Sump# Sump# <br /> Sump Diameter: 46" 46" <br /> Sump Depth: 45" 45" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 16„ 16"Product <br /> Highest Piping Penetration: 23"Vapor <br /> Height from Tank Top to Lowest 18" 18" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' Water Line 22" Water Line 27" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes <br /> shutdown?* <br /> Was fail-safe verified to be No No <br /> operational?* <br /> Wait time between applying water <br /> 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 10:12 10:25 <br /> Initial Reading(RI): .001 .001 <br /> Test End Time: 10:42 10:55 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced and Yes Yes <br /> verified functional after testi n ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to an of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.