Laserfiche WebLink
KL E/NFEL DER <br /> \` Bright People.Right Solutions <br /> V <br /> 7 LIMITATIONS <br /> The conclusions and recommendations of this report are for design purposes for the D. Hill <br /> Trucking facility as described in the text of this report. The conclusions and recommendations in <br /> this report are invalid if: <br /> • The assumed grading details change <br /> • Occupancy or wastewater loading increases from those assumed herein <br /> • The report is used for adjacent or other property <br /> • Any other change is implemented which materially alters the project from that proposed <br /> at the time this report was prepared. <br /> The scope of services was limited to groundwater sampling and percolation testing on the subject <br /> property. It should be recognized that definition and evaluation of subsurface conditions are <br /> difficult. Judgments leading to conclusions and recommendations are generally made with <br /> incomplete knowledge of the subsurface conditions present due to the limitations of data from <br /> field studies. <br /> Kleinfelder offers various levels of investigative and engineering services to suit the varying needs <br /> of different clients. Although risk can never be eliminated, more-detailed and extensive studies <br /> yield more information, which may help understand and manage the level of risk. Since detailed <br /> study and analysis involve greater expense, our clients participate in determining levels of service <br /> which provide information for their purposes at acceptable levels of risk. The client and key <br /> members of the design team should discuss the issues covered in this report with Kleinfelder so <br /> that the issues are understood and applied in a manner consistent with the owner's budget, <br /> tolerance of risk, and expectations for future performance and maintenance. <br /> Recommendations and/or conclusions contained in this report are based on our field <br /> observations, reviewed subsurface explorations and percolation test data performed by others <br /> and provided to us, and our present knowledge of the proposed construction. It is possible that <br /> soil or groundwater conditions could vary between or beyond the points explored. If soil or <br /> groundwater conditions are encountered during construction that differ from those described <br /> herein, the client is responsible for ensuring that Kleinfelder is notified immediately so that we <br /> may reevaluate the recommendations of this report. If the scope of the proposed construction <br /> 20210068.001A/ST020R110989 Page 12 of 14 April 30, 2020 <br /> ©2020 Kleinfelder www.kleinfelder.com <br />