My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL PARK
>
544
>
2231-2238 – Tiered Permitting Program
>
PR0546075
>
COMPLIANCE INFO_1993 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 11:18:37 AM
Creation date
7/30/2020 7:44:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993 - 2017
RECORD_ID
PR0546075
PE
2231
FACILITY_ID
FA0026057
FACILITY_NAME
OLIN INTERCONNECT TECHNOLOGIES
STREET_NUMBER
544
STREET_NAME
INDUSTRIAL PARK
STREET_TYPE
DR
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
544 INDUSTRIAL PARK DR
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\I\INDUSTRIAL PARK\544\PR0546075\COMPLIANCE INFO 1993 - 2017.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
------------------------------------------------------------ <br /> PART THREE - TREATMENT PROCESS FLOW <br /> ------------------------------------------------------------------- <br /> SECTION 1 - LIFT STATION <br /> To Ecrualiu 11.,r, <br /> CPrJlr��icJ'd/Y�r�n�� Tc�nk <br /> N <br /> fI tAP tl tW O) <br /> uvn ON Wo5 fL' Wq/CY <br /> bcyf/ktf1W5 <br /> HO <br /> Ahm fie", <br /> H <br /> rre"� s�noc%tafit7� <br /> SM sJSfrm <br /> L ;,"T <br /> Z Fcbf ✓&I✓e,S <br /> LL Baia <br /> Kari Floor I- <br /> 0—— - S wifch I 45-0 Gallon SlPfl forffRy fcYp)k <br /> Figure 3-1 Kari float switch Figure 3-2 Lift station <br /> 1. 1 Equipment list: lEa. 450 gallon steel coated tank <br /> lEa. Kari float switch (Model : 4Y5E) <br /> 2Ea. Self priming centrifugal pumps <br /> (Model: GNOK 1 1/2 / 2DL-D1. 5C) <br /> 2Ea. 211 true union ball valves <br /> 2Ea. 21' foot valves <br /> Wastewater from the water recycle <br /> system and anodization lines are routed <br /> to the 450 gallon tank for immediate <br /> collection (Figure 3-2) <br /> 1. 2 Pump operation 1. The level of the wastewater in the <br /> 450 gallon tank rises to the first <br /> stage of the Kari float switch. The <br /> Kari float energizes one of the self <br /> priming centrifugal pump. (Figure 3-1) <br /> 2 . If the first pump fails to hold the <br /> water level in the 450 gallon tank <br /> down, the water level will reach the <br /> second stage of the Kari float switch <br /> which energizes the second pump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.