My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL PARK
>
555
>
2231-2238 – Tiered Permitting Program
>
PR0507092
>
COMPLIANCE INFO_1993 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 3:38:30 PM
Creation date
7/30/2020 7:44:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993 - 2012
RECORD_ID
PR0507092
PE
2231
FACILITY_ID
FA0007093
FACILITY_NAME
QUALEX
STREET_NUMBER
555
STREET_NAME
INDUSTRIAL PARK
STREET_TYPE
DR
City
MANTECA
Zip
95336
APN
22119036
CURRENT_STATUS
02
SITE_LOCATION
555 INDUSTRIAL PARK DR
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\I\INDUSTRIAL PARK\555\PR0507092\COMPLIANCE INFO 1993 - 2012.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chemical Spill Response Plan <br /> General Information: <br /> Qualex, Inc. <br /> 555 Industrial Park Drive <br /> Manteca, CA 95337 <br /> D(209) 239-8631 / N(209 ) 239-5948 <br /> Standard Industrial Code (SIC)---- 7384 <br /> Photofinishing Laboratories <br /> Revised: June 13, 1995 <br /> Chemical Inven`tory <br /> Reference +ha atcckerY inventory of chemicals . <br /> Site Map <br /> Sea .�� <br /> A site map illustrating locations of chemical storage areas, <br /> chemical mixing areas, processors, silver recovery systems, floor <br /> drains, and spill control structures and supplies is attached. <br /> Initial Response and Evaluation of Spill Incident <br /> If the spill is emitting strong vapors the alarm system will be <br /> activated to initiate an evacuation. Emergency Action Plan <br /> procedures will be followed. The Spill Response Contractor will <br /> be summoned using the emergency phone list. If possible, plant <br /> responders are to remain close to the spill area during initial <br /> evacuation to prevent other employees from entering the area. If <br /> an immediate evacuation is not required, in-house spill response <br /> procedures will be followed. <br /> All Emergency Preparedness Team members will report to the spill <br /> responder staging area. Wardens will be appointed to keep other <br /> employees out of the area. Identification of the spilled <br /> substance will be determined, and evacuation necessity <br /> re-evaluated. If the spill presents significant hazards due to <br /> vapors, proximity to incompatible substances, or sources of <br /> ignition, a general evacuation will commence. The Hazard <br /> Communication Standard provides more detail on compatibilities <br /> and propensity of chemicals to emit gases . <br /> If the Spill Is Incidental, Spill Containment Will Commence Using <br /> Spill Containment Materials Provided. <br /> Responders will wear the appropriate PPE. <br /> Emergency Preparedness <br /> Chemical Spill Response Plan <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.