My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
1313
>
2231-2238 – Tiered Permitting Program
>
PR0527699
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 5:17:14 PM
Creation date
7/30/2020 7:46:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527699
PE
2231
FACILITY_ID
FA0006195
FACILITY_NAME
Mepco Label Systems
STREET_NUMBER
1313
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
St
City
Lodi
Zip
95240
APN
04705013
CURRENT_STATUS
02
SITE_LOCATION
1313 S Stockton St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\S\STOCKTON\1313\PR0527699\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thule Towing Systems Pagel of 2 <br /> Aris Cacapit [EH] <br /> From: Melissa [Melissa@cdms.com] <br /> Sent: Thursday, July 16, 2009 12:08 PM <br /> To: Aris Cacapit[EH] <br /> Cc: Jim Carro <br /> Subject: Thule Towing Systems <br /> Attachments: Schematic Line Layout_Thule.pdf; TPPIotPlan_Thule_5-08.pdf <br /> Hello Acis, <br /> I just left a message on your voicemail ... <br /> We spoke in early June and you were going to discuss the project with your supervisor and I was going <br /> to get you a more thorough description of the process (below) and a drawing(attached). <br /> Please give me a call and let's discuss at your earliest convenience. <br /> I am usually in from 8:30 am to 3:00 pm ... I expect that is exactly when you are OUT -but I hope we <br /> can connect. I will stay later than 3:00 if I know we can talk. <br /> Waste generating process: <br /> Our rinse stations in our washer area of the paint line are Stages (tanks) 2, 4, 5 and 7, each rinse tank <br /> was tested separately. There are a total of 8 stages in the paint line and are as follows: <br /> Stage 1 is Potassium hydroxide for cleaning the oils and dirt off of the parts; it is a spray wash heated to <br /> 170 degrees and is changed out 3 to 4 times per year. It is pumped into totes than hauled offsite by <br /> Advanced Chemical Treatment. <br /> Stage 2 pre rinse I and post rinse 2 is a rinse tankfilled with City-supplied water; the pre rinse and post <br /> rinse are spray washes that are supplied by the stage 2 spray wash pump and drain back into the tank <br /> We change this tank out on a weekly basis and refill with City water. <br /> Stage 3 is a Citric Acid spray wash for removing scale and carbon from the parts; it is heated to 170 <br /> degrees and is changed out on a monthly basis,pumped into totes and hauled offsite by Advanced <br /> Chemical Treatment. <br /> Stage 4 pre rinse I and post rinse 2 is a rinse tank filled with City water that is a spray wash like stage 2 <br /> tank; it is drained and refilled on a weekly basis. <br /> Stage 5 is a dip rinse tank that is filled from a Reverse Osmosis water system and has a pre rinse and <br /> post rinse spray that drains back into the tank. This tank is changed out about twice per year and is <br /> basically distilled water. <br /> Stage 6 is the actual paint tank that the parts are dipped into and never drains at all; we clean and refill <br /> with the existing paint being put back into the tank. <br /> Stage 7 pre rinse I and post rinse 2 is a city-water filled tank that is a dip process; this tank is cleaned <br /> and refilled twice per year both rinses drain back to the tank. <br /> 7/17/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.