My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 9:48:28 AM
Creation date
7/31/2020 11:56:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6 <br /> VIU, MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed If a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ® ❑ ❑ <br /> functionally tested and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their ® ❑ ❑ <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected, functionally tested , and confirmed operational? ® ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under4spenser containment? ® ❑ ❑ <br /> Does the turbine automatically shut down If the piping secondary containment monitoring system fails to operate or is electrically ® ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down If the piping secondary containment monitoring system detects a leak? ® ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) ® Sump ® Under-dispenser containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? ❑ ❑ <br /> Foran answer of "N" above describe In section W how and when these deficiencies were or will be corrected. <br /> We COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed, (Do not complete this section.) Y N NA <br /> This section must be completed if In-tank gauging Is used to Perform leak detection monitoring. <br /> Has all Input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for ground ❑ <br /> faults? <br /> Were all In-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, ❑ ❑ ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? 01 ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? 01 ❑ 1 ❑ <br /> E Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ [1 <br /> For any answer of "N" above describe in section Xi how and when these deSciencies were or will be corrected. <br /> XI. COMMENTS <br /> c <br /> V a Yam N Nn NO a Nnt Onr&taNa <br />
The URL can be used to link to this page
Your browser does not support the video tag.