Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM Page 6 of 6) <br /> XII. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) y N NA <br /> This section must be completed IULDs are Installed. <br /> Was a leak simulated to verify LLD performance? ® ❑ ❑ <br /> Check all that a Simulated leak rate verified: 03GPH 0. 1 GPH 0.2 GPH <br /> Was the testing apparatus properly calibrated? ® ❑ ❑ <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? ® ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system is disabled or disconnected? ❑ ❑ <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or falls a test? ❑ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ® ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ® ❑ ❑ <br /> For any answer of "N" above describe In section XNI how and when these issues were or will be corrected. <br /> X111. COMMENTS <br /> j XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> I ® Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitodrig is used to perforin leak detection monitoring. <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s) Monitored by this Sensor Test Test <br /> i <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fall <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> How was interstitial communication verified? ❑ Simulated leak at far ends of the interstitial space. L1 Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ® Yes ❑ No (Describe the reason in section XV below.) <br /> For any answer of "FAIL" above descdbe In section XV how and when these issues were or wil! be corrected. <br /> XV. COMMENTS <br />(', r PW a r arkvw nor hrr rr V a Vaa N a Nn NA a " WWirahra VPH a Van n M Pr0M 'MMW n* Mor Irl a klmmr=Hm <br />