My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
121
>
2300 - Underground Storage Tank Program
>
PR0232594
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 11:56:25 AM
Creation date
7/31/2020 3:09:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0232594
PE
2361
FACILITY_ID
FA0004573
FACILITY_NAME
SJ COUNTY PARKING GARAGE
STREET_NUMBER
121
Direction
S
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912001
CURRENT_STATUS
01
SITE_LOCATION
121 S SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br />Software Version Installed: 329. <br />ks� <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. comments: AARON ON SITE WITH EH .ALL PASSED <br />Monitoring System Certification Page 2 of 4 2/21/07 <br />® <br />Yes <br />❑ <br />No* <br />Is the audible alarm operational? <br />® <br />Yes <br />❑ <br />No* <br />Is the visual alarm operational? <br />® <br />Yes <br />❑ <br />No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />® <br />Yes <br />❑ <br />No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br />operation? <br />❑ <br />Yes <br />❑ <br />No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />® <br />N/A <br />® <br />Yes <br />❑ <br />No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br />❑ <br />N/A <br />fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) ® Sumpfrrench <br />Sensors; ® Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ® Yes; ❑ No. <br />❑ <br />Yes <br />❑ <br />No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />® <br />N/A <br />installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity <br />does the alarm trigger? 0% <br />❑ <br />Yes <br />® <br />No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and model for all replacement parts in Section E, below. <br />[]Yes* <br />® <br />No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />® <br />Yes <br />❑ <br />No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />® <br />Yes <br />❑ <br />No* <br />Is all monitoring equipment operational per manufacturers specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. comments: AARON ON SITE WITH EH .ALL PASSED <br />Monitoring System Certification Page 2 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.