My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
121
>
2300 - Underground Storage Tank Program
>
PR0232594
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 11:56:25 AM
Creation date
7/31/2020 3:09:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0232594
PE
2361
FACILITY_ID
FA0004573
FACILITY_NAME
SJ COUNTY PARKING GARAGE
STREET_NUMBER
121
Direction
S
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912001
CURRENT_STATUS
01
SITE_LOCATION
121 S SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. nm an Gauging /SIR Equipment: <br />❑ Check this box if tank gauging is used only for inventory��qq��t ol. , a tto <br />® Check this box if no tank gauging or SIR equipment is inmll�d. 9 <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />�bk1IFfONIVit:N IfAl� <br />AR r <br />NT <br />® Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />® Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />® Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />® Yes <br />❑ No* <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />❑ No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />Line Leak Detectors (LLD): <br />❑ Check this box if LLDs are not installed. <br />* In Section H, below, describe how and when these deficiencies were or win no <br />® YrYes <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ No* <br />N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ No* <br />® N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />® N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® Yes <br />❑ No* <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />H. Comments: <br />LD PASSED <br />corrected. <br />Monitoring System Certification Page 3 of4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.