My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWELL
>
1975
>
2300 - Underground Storage Tank Program
>
PR0232521
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 11:08:45 AM
Creation date
8/3/2020 11:09:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232521
PE
2361
FACILITY_ID
FA0004044
FACILITY_NAME
TRACY USD - SERVICE CENTER
STREET_NUMBER
1975
Direction
W
STREET_NAME
LOWELL
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23213008
CURRENT_STATUS
01
SITE_LOCATION
1975 W LOWELL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELOW GROUND PRODUCTS www . opwgiobal . com <br /> Patent Pending <br /> Preve�t���n <br /> OV, <br /> Are you Compliant <br /> with the New EPA <br /> Overfill Valve Test <br /> Requirements ? <br /> Now you can be, with the <br /> New OPW Testable 71 SO <br /> *. Overfill Prevention Valve <br /> Ilk <br /> rhe easiest, most affordable way <br /> to ensure overfill compliance <br /> ♦ UST systems (drop tube, overfill prevention valve, <br /> spill containers) must be tested for vapor tightness <br /> ;? ` + Overfill prevention valves shut off devices must <br /> be manually inspected <br /> • OPW offers the only overfill prevention valve that can <br /> - be tested without removal from the tank e test in 60 <br /> seconds versus 60 minutes per tank <br />
The URL can be used to link to this page
Your browser does not support the video tag.