My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWELL
>
1975
>
2300 - Underground Storage Tank Program
>
PR0232521
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 11:08:45 AM
Creation date
8/3/2020 11:09:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232521
PE
2361
FACILITY_ID
FA0004044
FACILITY_NAME
TRACY USD - SERVICE CENTER
STREET_NUMBER
1975
Direction
W
STREET_NAME
LOWELL
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23213008
CURRENT_STATUS
01
SITE_LOCATION
1975 W LOWELL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a 1maomparry <br /> Testable 71 SO Overfill Prevention Valve <br /> Patent Pending r �` <br /> nrication <br /> Easy as 1 .2 *3 <br /> The OPW Testable 71 SO helps <br /> you be in compliance with <br /> the NEW EPA Regulations <br /> • The Only UST Overfill Prevention <br /> Valve that is testable without <br /> removal from the tank <br /> Loosen test plwj <br /> • A testable feature is attached to a <br /> sealed plug in the inlet Adaptor <br /> • The plug Is easily accessed with <br /> a standard socket extension <br /> • Attached to the extension, the testable <br /> feature can be raised and lowered, <br /> allowing the user to Inspect the valve <br /> Ulitfioatwith cable operation from the Inside of the tube <br /> to simulate pill ♦ The plug Is then easily reinstalled to <br /> the inlet Adaptor from grade <br /> 3 • No fill components, overfill valves, or <br /> vapor tight seals have to be removed <br /> - avoids compromising vapor tight <br /> compliance <br /> • The Testable 7150 uses the same <br /> -- - Industry leading overfill prevention <br /> W15date proper technology for strong vapor tight <br /> poppet operation compliance <br /> • B100 Compatible ( ULC) <br /> NOTE : The OPW 7150 is designed for use on tight-fill gravity drop applications only. <br /> Do not use for pressure fill applications. <br /> Ordering Specifications <br /> A- Upper B- Lower G- Overall Max. Riser Max. Nomi- Max. Actual Weight <br /> Product /f Description Tube Length Tube Length Length Length nal Tank Dia, Tank Die. <br /> in. m In. m In. In In. In In. m in. In lbs. kg <br /> 7150-400CTB; Testable Vapor-Tight Overfill 60 1 .5 83 2.1 1543/4 3.g 5311 . 1 .4 96 2.4 107 2.7 16 7 <br /> Valve, 5 Ft. Bury, 8 Foot Tank <br /> 7150-410CTB• Testable Vapar-Tight Overfill 120 3.1 102 2.6 2343/4 5.9 1131h ' 2.9 120 3.1 126 32 25 11 <br /> Valve, 10 Ft Bury, to Foot Tank <br /> 7150-420CTB ` Testable Vapor•Tight Overfill 120 3.1 126 3.2 2583/4 6.5 11311 29 144 17 150 3.8 26 12 <br /> Valve, 10 Ft. Bury, 12 Foot Tank <br /> 206740-)(it Replacement Cable Kit <br /> ULC 8100 Compatible <br /> Listings and Look for this label for <br /> authentic OPW EVR <br /> Certifications Approved products. <br /> 112 9393 Princeton•Glendale Road Hamilton, Ohio USA 45011 Phone: (800) 422-2525 fax: (800) 421 -3297 <br />
The URL can be used to link to this page
Your browser does not support the video tag.