Laserfiche WebLink
f <br /> 64D <br /> [� 6 2019 <br /> D. Results of TestinglBervicingENVIVIC e ,i ti - Al, <br /> ) IVIE � � 4 �y� LTH <br /> Software Version Installed: I l a r <br /> fi # e a, W <br /> Com lets the followin chackllst: <br /> ® Yes ❑ No* Is the audible alarm operational? <br /> ® Yes ❑ No* is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> ® Yes ❑ No* Were all sensors Installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br /> ® NIA <br /> 0 Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut-down? (Check all that apply) ® Sump french Sensors; <br /> IN Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/dtsconnection? ® Yes; ❑ No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br /> ® NIA Installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating property? If so, at what percent of tank capacity <br /> does the alarm trigger? % <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts In Section E, below. <br /> []Yes* ® No Was liquid found Inside any secondary containment systems designed as dry systems? (Check ail that apply) <br /> ❑ Product; ❑ Water. If yes, describe causes in Section E. below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br /> ® Yes ❑ No* Ia all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 2/21 /07 <br />