Laserfiche WebLink
F. In-Tank Gauging I SIR Equipment: ® Check this box If tank gauging is used only for inventory control. <br /> ❑ Check this box If no tank gauging or SIR equipment is installed. <br /> This section must be completed If inAank gauging equipment is used to perform leak detection monitoring, <br /> Complete the following checklist• <br /> ❑ Yes ❑ No" Has all Input wiring been inspected for proper entry and termination, Including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No" Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No" Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ Ne Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all Items on the equipment manufacturers maintenance checklist completed? <br /> • In Section N. below, describe how and when these deficiencies were or will be corrected. <br /> Una Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist <br /> ® Yes ❑ Ne For equipment startup or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: ® 3 g,p.h.; ❑ OA g ,p.h % ❑ 0.2 g.p,h. <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate withln regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ® Yes ❑ Ne For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ WA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No" For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system is disabled or disconnected? <br /> ® WA <br /> ❑ Yes ❑ Ne For electronic LLDs, does the turbine automatically shut off if any potion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> KLjH= <br /> , have all accessible wiring connections been visually Inspected? <br /> he equipment manufacturers maintenance checklist completed? <br /> • In Section H, below, describe how =^d whop these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 2/21 /07 <br />