<br /> PERFORMANCE SPECIFICATION
<br /> SECTION I GENERAL CONDITIONS SECTION I GENERAL CONDITIONS - CONTINUED SECTION 11 INSPECTIONS / TESTING
<br /> 0
<br /> TEST BEFORE PLACING THE SYSTEM IN SERVICE �-
<br /> PART 4
<br /> - CONTINUED s
<br /> PART1 -� GENERAL Table below lists current Manufacturer's Installation and Testing Guidelines that may 0
<br /> 1.1 SCOPE OF WORK: THE WORK INCLUDED IN THE CONTRACT FOR THIS PROJECT CONSISTS OF THE FURNISHING OF ALL 4.41 LIENS: CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR AGAINST THE PROPERTY BY ITS be applied to the fuel system components after assembly but before backfilling.
<br /> EQUIPMENT AND APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL SUBCONTRACTORS, LABORERS, MECHANICS OR MATERIAL MEN, AND SHALL INDEMNIFY, PROTECT AND SAVE OWNER Before the beginning of fuel system installation,fuel contractor is to be responsible
<br /> LABOR, MATERIALS, SERVICES, HARMLESS FROM AND AGAINST ALL SUCH CLAIMS AND LIENS.
<br /> OF A GASOLINE INSTALLATION FOR 7-ELEVEN, INC. for reading through the entire Installation Manual and Operating Guidelines as wellas
<br /> TO THE COMPLETE CONSTRUCTION
<br /> any applicable supplemental materials. It is the responsibility of the fuel contractor
<br /> 4.12 EQUIPMENT RESPONSIBILITY: CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING, RECEIVING, UNLOADING, and fuel operator to understand and follow all requirements contained in the CD
<br /> PART 2 - AGREEMENT HANDLING AND PROVIDING PROTECTED INSIDE STORAGE FOR ALL OWNER SUPPLIED EQUIPMENT AND MATERIAL. installation and testing manuals,Work must be performed according to standard
<br /> CONTRACTOR SHALL INSPECT EQUIPMENT UPON RECEIPT AND IMMEDIATELY REPORT ANY DAMAGE DUE TO SHIPPING TO industry practices applicable to tank installations and operations.Work must also
<br /> 2.1 CONTRACTOR SHALL NOT START WORK WITHOUT CONTRACT AND APPROVED SEALED PLANS. THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE TO COMPLY
<br /> comply will all applicable codes, regulations and standards of appropriate �
<br /> WITH THESE REQUIREMENTS, DISPENSERS SHALL BE PROTECTED WITH SHIPPING BOXES UNTIL STORE IS TURNED OVER COMPONENT MANUFACTURER governmental agencies.
<br /> FOR OPENING. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ADEQUATE AND LOCKED STORAGE OF OWNER'S
<br /> PART 3 - INTENT OF D RAW I N G AND SPECIFICATIONS MISCELLANEOUS EQUIPMENT, TO INCLUDE GASOLINE CONSOLE, PRIOR TO OPENING OF THE STORE. INSTALLATION http://www.zcl.com/assets/documents/library/installation%20 p!
<br /> WHICH THE MANUAL manual%20and%20operating%20guidelines%20(imog)%20for% Proto 11-05-18
<br /> 3.1 THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PRESCRIBE A COMPLETE WORK OR IMPROVEMENT4.13 FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND MISCELLANEOUS CONFIRMATION OF DOUBLE-WALLED STORAGE XERXES"A ZCL 20xerxes%20tanks.pdf
<br /> CONTRACTOR SHALL PERFORM IN FULL COMPLIANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL EQUIPMENT RECEIVING INFORMATION AS REQUIRED BY LOCAL CONSTRUCTION OFFICE. TANK COMPANY"
<br /> 20
<br /> PERFORM ALL WORK NECESSARY TO COMPLETE THE WORK IN A SATISFACTORY AND ACCEPTABLE MANNER. TESTING httpual%20.z d%20/assets/documents/library/installationfor
<br /> 4.14 FUEL CONTRACTOR SHALL PROVIDE ALL PIPING,WIRING, MATERIAL AND LABOR AS REQUIRED TO INSTALL OWNER PROCEDURE manual%20and%20operating%20guidelines%20(imog)%20for%
<br /> 3.2 THE CONTRACTOR SHALL, UPON DISCOVERY, REPORT ANY DISCREPANCIES IN THE DRAWINGS AND SPECIFICATIONS TO SUPPLIED EQUIPMENT. INCLUDE MONEY IN BID PROPOSAL FOR INSTALLATION OF OWNER SUPPLIED EQUIPMENT UNLESS 20xerxes%20tanks.pdf
<br /> THE OWNER'S CONSTRUCTION MANAGER. NOTED OTHERWISE. M
<br /> INSTALLATION http•//www•nov.com/Segments/Completion and Production
<br /> COMPLIMENTARY. ANYTHING MENTIONED IN THE Solutions/Fiber Glass Systems/Fuel Wandlin�d Thread�IIA. �
<br /> 3.3 THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BEC MANUAL
<br /> SPECIFICATIONS N5 AND NOT SHOWN ON THE DRAWINGS, OR SHOWN ON THE DRAWINGS AND NOT MENTIONED IN THE - DOUBLE-WALLED PIPING NOV a (q
<br /> SPECIFICATIONS, SHALL BE OF LIKE N THE R IF SHOWN OR MENTIONED IN BOTH. GENERALLY, THE SPECIFICATIONS PART 5 PROTECTION TESTING Q z
<br /> S Z
<br /> DESCRIBE WORK WHICH CANNOT BE READILY IDENTIFIED ON THE DRAWINGS AND INDICATED TYPES, QUALITIES AND 5.1 CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED BY HIM OR HIS WORKMEN TO THE PROCEDURE http://www.nov.com/docHandler.aspx?puid=12bN�u lic ac bss.cfm oL35C O
<br /> RIALS AND EQUIPMENT REQUIRED FOR THE WORK. IT IS NOT INTENDED EQUIPMENT OF THE OWNER, OR TO THE WORK OR MATERIALS OF OTHER CONTRACTORS. CONTRACTOR I CO0
<br /> METHODS OF INSTALLATION OF THE VARIOUS MATE PROPERTY OR
<br /> M OF WORK IN THE SPECIFICATIONS WHICH CAN BE ADEQUATELY SHOWN ON THE DRAWINGS NOR INSTALLATION http://www.gilbarco.com/Bald/gold public access. m.section o �
<br /> TO MENTION EVERY ITE SHALL MAKE GOOD ANY LOSS, DAMAGE OR INJURY WITHOUT COST TO OWNER FOR SUCH LOSS OR DAMAGE. MANUAL _id=361 ZZ 00 Q N U
<br /> TO SHOW ON THE DRAWINGS ALL ITEMS OF WORK DESCRIBED OR REQUIRED BY THE SPECIFICATIONS EVEN IF THEY ARE LEAK DETECTION SENSOR VEEDER ROOT _
<br /> OF SUCH NATURE THAT THEY COULD HAVE BEEN SHOWN THEREON. ALL MATERIALS OR LABOR FOR WORK WHICH IS 5.2 CONTRACTOR SHALL PROVIDE AND MAINTAIN SUITABLE TEMPORARY SIDEWALKS, FENCES, LIGHTS, SIGNS OR OTHER TESTING http://www.gilbarco.com/gold/gold public_access.cfm?section z W Z U L!_
<br /> SHOWN ON THE DRAWINGS OR IS REASONABLY INFERABLE AS BEING NECESSARY TO PRODUCE A FINISHED JOB SHALL BE STRUCTURES AND DEVICES AS REQUIRED BY LAW, DO NOT OBSTRUCT OR INTERFERE WITH TRAFFIC IN PUBLIC STREETS, PROCEDURE =id=361
<br /> ETHER OR NOT THE WORK IS EXPRESSLY COVERED IN THE SPECIFICATIONS. ALLEYWAYS OR PRIVATE RIGHT-OF-WAYS. IF WORK IS SUSPENDED, KEEP ALL ROADWAYS AND SIDEWALKS IN PROPER W ¢ Z 80 Z {.3
<br /> PROVIDED BY THE CONTRACTOR WH INSTALLATION http://www.gilbarco.com/gold/goid-public ilbarco.com/ old/ old ublic access.cfm?section W
<br /> 3.4 THE CONTRACTOR, SUBCONTRACTORS AND ALL TRADES SHA0-0 LL EXAMINE THE SITE AND ASCERTAIN EXISTING CONDITIONS CONDITION AND PUT AND LEAVE THEM IN PROPER CONDITION AT TERMINATION OF WORK. MANUAL _id=364 W 0 W U)
<br /> PRIOR TO THE START OF THEIR PORTIONS OF THE WORK. BEFORE ORDERING MATERIALS OR DOING ANY WORK, THE 5.3 CONTRACTOR SHALL SEND PROPER NOTICES, MAKE NECESSARY ARRANGEMENTS AND PERFORM ALL WORK REQUIRED AUTOMATIC TANK GUAGE5 VEEDER R007 TESTING J } W Z U 0
<br /> CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR THE CORRECTNESS OF ALL MEASUREMENTS AT THE SITE. ANY FOR THE CARE, PROTECTION AND MAINTENANCE OF PUBLIC UTILITIES ON AND AROUND THE BUILDING SITE, ASSUMING ALL PROCEDURE http://www.veeder.com/us/productstomauc-tank gaga e-gau a W p p Z
<br /> DIFF
<br /> ERENCES WHICH MAY BE FOUND BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS INDICATED ON THE DRAWINGS OR RESPONSIBILITY AND PAYING ALL COSTS FOR WHICH THE OWNER MAY BE LIABLE. CONTRACTOR HEREBY DECLARES HE -systems/atg-tls-consoles/tls-350r-automatic-tank-gau e W W J W J
<br /> SHOP DRAWINGS SHALL BE SUBMITTED TO THE OWNER'S CONSTRUCTION MANAGER FOR CONSIDERATION BEFORE HAS VERIFIED THE LOCATIONS OF THE EXISTING UNDERGROUND UTILITIES ON SITE PRIOR TO THE START OF WORK.
<br /> AND MEASUREMENTS INDICATED ON THE DRAWINGS UNLESS A SUBSTANTIAL CONTRACTOR HEREBY AGREES TO MAKE ARRANGEMENTS FOR AND TO PAY ALL CHARGES IN CON-JUNCTION WITH THE INSTALLATION http://www.opwgiobal.com/docs/libraries/manuals/retail-fueli j
<br /> PROCEEDING WITH THE ACTUAL DIMENSIONS
<br /> ERROR HAS BEEN MADE. IF SUCH AN ERROR SHOULD OCCUR, IT SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S RELOCATION'S OF EXISTING UTILITIES AS REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL UTILITY MANUAL n below- round/o w-fcs-manuals/71so-testable-(h15524pa}- ILL.
<br /> CONSTRUCTION MANAGER AND RESOLVED BEFORE PROCEEDING WITH WORK. EASEMENTS, HOOKUP CHARGES, TAP FEES & SYSTEM DEVELOPMENT FEES OR BONDS AS NECESSARY FOR COMPLETION 1-30-14.pdf?sfvrsn=4 =
<br /> OF THIS PROJECT. OVERFILL PREVENTION DEVICES OPW O
<br /> INTO DIVISIONS, SECTIONS AND PARAGRAPHS, AND THE ARRANGEMENT OF THE TESTING http://www.o w lobal.com/docs/libraries/manuals/retail-fuefi o
<br /> 3.5 THE ORGANIZATION OF SPECIFICATIONSN
<br /> E NOT INTENDED TO CONTROL THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN CONTRACTOR SHALL PROPERLY COVER OVER, SECURE PROCEDURE w-fcs-manuals/71so-testable-(h15524 a -
<br /> DRAWINGS ARE 5.4 IF ALL OR PART OF THE WORK I5 SUSPENDED FOR ANY REASON,
<br /> THE ESTABLISHING THE EXTENT OF WORK TO BE PERFORMED BY ANY TRADE. AND PROTECT ANY PORTION LIABLE TO SUSTAIN INJURY FROM ANY CAUSE. 1-30-14. df?s r glob
<br /> WINGS INDICATE GENERAL DESIGN AND ARRANGEMENTS DRAWINGS ARE htt ://www.opw lobal.com/docs/libraries/manuals/retail-fueli
<br /> 3.6 DRAWINGS AND SPECIFICATIONS: DRAWINGS 5.5 PRODUCT PROTECTION: CONTRACTOR SHALL PROVIDE ADEQUATE AND SECURE PROTECTION OF PRODUCT IN TANKS INSTALLATION
<br /> E NOT SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL PLANS AND Spill-Installation
<br /> pibeIow-ground Inst 2 2181 2-1313 G. EDGE us=Thread-OnteF
<br /> DIAGRAMMATIC AND ARE UPON DELIVERY UNTIL TURNED OVER FOR OPERATION. ALL FILL, VENT AND GAUGING CAPS AND/OR OPENINGS SHALL BE MANUAL
<br /> ENT TO BE FURNISHED. VERIFY DIMENSIONS IN THE FIELD. Spill Installation_Inst 202181_2-13-13_G. df?Status-Master
<br /> EQUIPMENT SECURED AND PADLOCKED TO PREVENT VANDALISM OR THEFT.
<br /> SPILL CONTAINMENT sfvrsn=0
<br /> OPW
<br /> MANHOLES
<br /> http://www.opwglobal.cam/docs/libraries/manuals/retail-fueli
<br /> F THE C O N T RAGT O R PART � - SUBSTITUTION O F MATERIALS TESTING ng/below-ground/opw-fcs-manuals/Double_Wall_Spill Contain �
<br /> PART 4 - RESPONSIBILITY O PROCEDURE erVac Test Installation Instructions - En lisp 202383. df?St
<br /> 4.1 CONTRACTOR HEREBY DECLARES HE HAS READ ALL SPECIFICATIONS AND EXAMINED THE DRAWINGS AND 6.1 MATERIALS AS SPECIFIED REPRESENT REQUIRED STANDARDS. SUBSTITUTION MAY BE PROPOSED IN WRITING WITH atus=Master&sfvrsn-0
<br /> THAT HE UNDERSTANDS ALL CONDITIONS. ADEQUATE SUPPORTING DATA FURNISHED. USE OF SUBSTITUTE MATERIALS IS DEPENDENT ON RECEIPT OF WRITTEN
<br /> APPROVAL FROM OWNER'S APPROVED REPRESENTATIVE. http://www.opwglobal.com/docs/iibraries/manuals/retai1-fueli
<br /> BY DECLARES HE HAS VISITED THE SITE AND 1S FAMILIAR WITH THE CONDITIONS INSTALLATION ng/below- round/opw-fcs-manuals/10 Seri es_E137 ency She
<br /> 4.2 CONTRACTOR HERE MANUAL
<br /> RK. NO ALLOWANCES SHALL BE MADE SUBSEQUENTLY ON BEHALF OF THE ar Valve Installation instructions - English H11374PA.pdf?St
<br /> CONTRACTOR
<br /> PART 7 - COMPLETION OF CONTRACT
<br /> CONTRACTOR FOR ANY ERROR NEGLIGENCE ON HIS PART. IF IN THE PERFORMANCE OF THE CONTRACT, atus-Master&s rsn=0
<br /> LATENT CONDITIONS AT THE SITE ARE FOUND TO BE MATERIALLY DIFFERENT FROM THOSE INDICATED IMPACT VALVES OPW
<br /> OR UNKNOWN CONDITIONS UNUSUALLY INHERENT IN WORK OF 7.1 THE CONTRACT SHALL BE CONSIDERED FULFILLED, SAVE AS PROVIDED IN ANY MAINTENANCE STIPULATIONS, BOND OR BY htt ://www.a w iobal.com/docs/libraries/manuals/retail-fueli
<br /> BY THE DRAWINGS AND SPECIFICATIONS, TESTING
<br /> AND SPECIFIED, THE ATTENTION OF THE OWNER'S CONSTRUCTION MANAGER LAW,WHEN ALL THE WORK HAS BEEN COMPLETED WITH FINAL INSPECTION AND ACCEPTANCE MADE BY ALL APPLICABLE n -below- round/opw-fcs-manuals? E Series 1137 Emergency She
<br /> THIS CHARACTER SHOWN PROCEDURE
<br /> ED IMMEDIATELY TO SUCH CONDITIONS BEFORE THEY ARE DISTURBED. GOVERNING BUILDING DEPARTMENTS, FIRE MARSHAL'S OR OTHER JURISDICTIONS, ar s=Mas-Valve er&slation Instructions - English H11374PA.�df?St W
<br /> SHALL BE CALL W
<br /> otos=Master&sfvrsn=0 W
<br /> 4.3 CONTRACTOR HEREBY DECLARES THAT HE HAS READ AND IS FAMILIAR WITH THE APPLICABLE SOILS
<br /> 7.2 NOT USED INSTALLATION http://www.vaporiess.com/installation/installpdf/install Id200
<br /> REPORT. W � U
<br /> LEANING: MECHANICAL LINE LEAK VAPORLESS MANUAL 0�cif a
<br /> 7.3 C DETECTORS MANUFACTURING TESTING http://www.vaporiess.com/installation/installpdf/install_id200
<br /> CONTRACTOR SHALL BE RESPONSIBLE FOR STRICTLY ADHERING TO THE RECOMMENDATIONS OF SAID PROCEDURE O.pdf
<br /> SOILS REPORT FOLLOWING ALL APPLICABLE PROCEDURES NOTED THEREIN. EXISTING WATER TABLE SHALL 7.3.1 ALL WORK SHALL BE CLEAN AND READY FOR USE UPON COMPLETION. REMOVE TEMPORARY TAPES, W Q
<br /> POSSIBLY DETERMINE A DIFFERENT UTILIZATION OF THE TANK STRAPS AND TYPE OF BACK FILL WRAPPING, COATING, PAPER LABELS AND OTHER ITEMS. INSTALLATION a w Ci
<br /> o
<br /> MATERIAL. SHOULD GROUND WATER OR CONTAMINATION BE DISCOVERED DURING TANK EXCAVATION, SHALL BE IN STRICT ACCORDANCE WITH ELECTRONIC LINE LEAK MANUAL http://www.veeder.com/goid/download.cfm?doc id=6414 Z08
<br /> WORK SHALL BE SUSPENDED PENDING REVIEW BY 7-ELEVEN CONSTRUCTION MANAGER. 7.3.2 CLEANING METHODS FOR PROPRIETARY MATERIALS DETECTORS VEEDER ROOT
<br /> MANUFACTURER'S INSTRUCTIONS. CLEANING SOLUTIONS, AGENTS, SOLVENTS, WAXES OR OTHER TESTING O
<br /> 4.4 CONTRACTOR SHALL REPORT ANY OBJECTION TO MATERIALS, APPLIANCES, OR METHODS OF MATERIALS SHALL BE ONLY AS APPROVED BY THE MANUFACTURER OF THE MATERIAL INSTALLED 1N PROCEDURE htt ://www.veeder.com/ old/download.cfm?doc id=6414 = fr Q
<br /> N MANAGER AND OBTAIN A THE WORK. FRANKLIN INSTALLATION http:/Iwww.franklinfueling.com/media/468560/407293001-r1-
<br /> CONSTRUCTION SHOWN OR SPECIFIED TO THE OWNER'S CON FLEXIBLE CONNECTORS r70 v
<br /> DECISION BEFORE PROCEEDING. FUELING MANUAL flex-connector-installpdf � c
<br /> 7.3.3 CLEANUP: CONTRACTOR SHALL CLEAN UP ALL DEBRIS CAUSED BY THE WORK OF THIS SECTION,
<br /> 4.5 PROPOSALS: CONTRACTOR SHALL SUBMIT BID ONLY ON 7-ELEVEN'S FORM THAT WILL BE PROVIDED BY KEEPING THE PREMISES NEAT AT ALL TIMES. a
<br /> 7-ELEVEN'S LOCAL CONSTRUCTION MANAGER, "COST OF CONSTRUCTION" PROPOSALS SUBMITTED ON ANY •
<br /> OTHER FORM SHALL BE REJECTED AND RETURNED. PROPOSALS NOT COMPLETELY AND PROPERLY FILLED PART 1 - GENERA
<br /> OUT SHALL BE REJECTED. PROPOSALS SHALL INCLUDE MONEYS FOR REMOVAL OF ALL EXISTING PART 8 - CODES
<br /> IMPROVEMENTS A5 REQUIRED FOR GASOLINE INSTALLATION. 1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, SERVICES AND EQUIPMENT AS REQUIRED TO PROVIDE N W 0 J
<br /> COPIES OF 8.1 THE FOLLOWING CODES ARE MADE A PART OF THIS SPECIFICATION. SAID CODES SHALL DICTATE MINIMAL ACCEPTABLE INSPECTION SERVICES OF THE FUELING INSTALLATION. aN'3 O 0') Z ~
<br /> 4.6 PERMITS: CONTRACTOR SHALL, AS DIRECTED BY 7-ELEVEN, PAY FOR ALL APPLICABLE PERMITS AND AND FEES. C STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL GOVERNING AUTHORITIES DICTATE HIGHER OR MORE Q �
<br /> PERMITS AND CERTIFICATES SHALL BE FORWARDED TO LOCAL 7-ELEVEN CONSTRUCTION MANAGER'S OFFICE OR SITE STRINGENT REQUIREMENTS WHICH SHALL TAKE PRECEDENCE: "� Z N
<br /> MANAGER PRIOR TO COMMENCEMENT OF WORK. FINAL CERTIFICATION OF ACCEPTANCE BY GOVERNING AUTHORITIES PART 2 - INSPECTIONS
<br /> ER PRIOR TO THE PROCESSING OF FINAL 1.1 NFPA 30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE Q �+ [Y]
<br /> SHALL ALSO BE ON FILE WITH LOCAL CONSTRUCTION OFFICE OR SITE MANAGER 8.
<br /> PAYMENT REQUEST. 2.1 INSPECTOR: 7-ELEVEN, INC. LOCAL CONSTRUCTION DEPARTMENT AND/OR APPOINTED REPRESENTATIVE SHOULD
<br /> 8.1.2 PEI MANUAL"RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND LIQUID STORAGE NOTIFIED TO OBSERVE TIGHTNESS TESTING OF PRODUCT PIPING, STAGE I &STAGE ll PIPING PRIOR TO BACKFILL.
<br /> 4.7 INSPECTIONS: CONTRACTOR SHALL BE REQUIRED TO ADHERE TO ALL REQUIREMENTS OF OWNER'S INSPECTION SYSTEMS."#RP-100-96(OR LATEST EDITION) U
<br /> REQUIREMENTS FOR NOTIFICATION, SITE PREPARATION REQUIREMENTS,
<br /> WITH RE UIR2.2 NOTIFICATION: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING 7••ELEVEN'S CONSTRUCTION DEPARTMENT 48 O v Co � �
<br /> PROGRAM. CONTRACTOR SMALL COMPLY WI Q
<br /> COMPLIANCE, ON-SITE PRESENCE DURING INSPECTION AND CORRECTION OF ANY DEFECTS OR RELATED PROBLEMS AS 8.1.3 OSHA AND LOCAL MUNICIPALITIES HOURS PRIOR TO REQUESTED INSPECTION (n 0 0 V
<br /> DIRECTED BY INSPECTING REPRESENTATIVE CONTRACTOR SHALL PROVIDE NO LESS THAN 48 HOURS NOTICE PRIOR TO
<br /> INSPECTION. 2.3 SPILLAGE: SHOULD SPILLAGE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR TESTING, LOCAL 7-ELEVEN a d c 0
<br /> CONSTRUCTION DEPARTMENT AND ENVIRONMENTAL DEPARTMENT ARE TO BE NOTIFIED IMMEDIATELY, ESTIMATED LOSS V-0 ;'? ° 1040 3 Q
<br /> 4.8 COORDINATION: FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING ALL PHASES OF THE GASOLINE PART 9 - WARRANTY I GUARANTEE OF PRODUCT AS WELL AS ACTION TO BE TAKEN BY CONTRACTOR TO SAFEGUARD THE EVENT FROM FURTHER MISHAP AND F 4)t � o Q " c
<br /> INSTALLATION WITH THE GENERAL CONTRACTOR IN CHARGE OF THE BUILDING OR MAJOR PORTION OF THE PROJECT. THE TO PROTECT THE GENERAL PUBLIC IS TO BE NOTED AND RECORDED. v.2 °} o `
<br /> CONTRACTOR SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE 9.1 EXCEPT WHERE SPECIAL GUARANTEES ARE REQUIRED IN EXCESS OF ONE (1}YEAR, THE CONTRACTOR AGREES 70 REPAIR o 0 a c 0 Q 046'0
<br /> ai C N
<br /> BUILDING GENERAL CONTRACTOR AND THE FUEL C E a �' S iE N �� o f
<br /> _ BLE FOR COMPLETION ON THE GASOLINE INSTALLATION. TIMETABLE FOR BUILDING AND GASOLINE AND RE-CERTIFY OR REPLACE THE DEFECTIVE COMPONENT OR ANY DEFECT IN MATERIAL OR WORKMANSHIP (BEYOND ( } 2.4 REPRESENTATIVE OF CONTRACTOR AND FUEL CONTRACTOR SHALL BE AVAILABLE ON SITE DURING TESTING PROGRAMS. C U� 0 a-�.6 m'�.F0
<br /> SCHEDULE AND TIMETABLE
<br /> SHALL COINCIDE AND COMPLIMENT EACH OTHER SO THAT ONE DOES NOT DELAY THE OTHER. ORDINARY WEAR AND TEAR}TO THE SATISFACTION OF THE OWNER'S CONSTRUCTION MANAGER FOR A PERIOD OF ONE 1
<br /> YEAR AFTER DATE OF ACCEPTANCE, WHETHER IN HIS WORK OR IN THAT OF SUBCONTRACTOR'S, WITHOUT C057 TO THE FAILURE TO COMPLY WITH THIS REQUIREMENT WILL RESULT IN ANY CORRECTIONS AND/OR REPAIRS REQUIRED BEING w��� ��n�o� � ��
<br /> PERFORMED BY OWNER AS REQUIRED. COST OF SAID REPAIRS AND/OR CONNECTIONS SHALL BE DEDUCTED FROM cx o N.aoi c .moi ?•Q
<br /> o SHOULD FUEL CONTRACTOR FAIL TO MEET DEADLINES AS ESTABLISHED BY THE SCHEDULE AND/OR HOLD UP THE OWNER. 3 0 E
<br /> 7-ELEVEN INC. RESERVES THE RIGHT TO RECTIFY THE SITUATION CONTRACT AMOUNT/-"S REQUIRED TO SATISFY THE SITUATION. � c c-o �;�t o
<br /> COMPLETION OF THE OVERALL BUILDING PROJECT, E-9-L- 0
<br /> 0-
<br /> 9.2 ALL PAVING WILL HAVE A TWO YEAR WARRANTY, _
<br /> �; 2.5 PROHIBITED WORK: CONTRACTOR SHALL SCHEDULE WORK SUCH THAT NO HEAVY EQUIPMENT IS OPERATING ON SITE U ° 1D Q Q'= (CDL-2 N
<br /> ACCORDINGLY.
<br /> O N >� c� ` ox,� 0 N
<br /> d E FOLLOWING: DURING INSPECTION (PROGRAMS. NO WELDING OR OPEN FLAMES SHALL BE ALLOWED ON SITE AT ANY TIME DURING TEST Ir cc y
<br /> 4.9 CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE o a 3 o
<br /> PROCEDURES. �
<br /> Q
<br /> � 4.9.1 CERTIFICATION FROM LOCAL/STATE GOVERNING AUTHORITIES A5 APPLICABLE FOR CONTRACTOR U M E NTAT I
<br /> 2.6 INSTALLATION REPORTS: SHOULD 7-ELEVEN OR THEIR APPOINTED REPRESENTATIVES BE UNABLE TO BE PRESENT AT SITE pfE5S1
<br /> CERTIFICATIONILICENSING FOR INSTALLATION OF GASOLINEPART 10 - AS BUILT PLAN AND DOC STORAGE TANK SYSTEM. FOR PURPOSES OF FlILING ANY INSPECTION REPORTS, CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE INSPECTION
<br /> ���
<br /> 10.1 UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE"AS-BUILT SITE PLAN"VERIFYING FINAL LOCATION OF AND FILING OF REPORT WITH LOCAL 7-ELEVEN, INC. CONSTRUCTION OFFICE. WRITTEN REPORT SHALL INCLUDE
<br /> 4.9.2 CERTIFICATION FROM EQUIPMENT MANUFACTURES AND SUPPLIERS (TANKS, PRODUCT LINES, IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, PIPING, PLUMBING AND ELECTRICAL. PHOTOGRAPHIC DOCUMENTATION OF ALL PROCEDURES.
<br /> ATG S, ETC.)AS TO
<br /> ATTENDING AND ACHIEVING CERTIFICATION FROM APPROPRIATE COMPANY FOR
<br /> cc 35558
<br /> INSTALLATION OF EQUIPMENT. 10.2 CONTRACTOR SHALL KEEP PHOTOGRAPHIC JOURNAL OF ALL PHASES OF THE COMPLETI= INSTALLATION. PHOTOGRAPHS 2.7 TEST FAILURE: SHOULD SYSTEM FAIL ANY PORTION OF TEST PROGRAM, CONTRACTOR SHALL IMMEDIATELY INSTIGATE
<br /> ARE TO BE PROPERLY DATED, IDENTIFIED AND FORWARDED TO LOCAL 7-ELEVEN, INC. CONSTRUCTION OFFICE, WITH FINAL PROCEDURES AS REQUIRED TO BRING SYSTEM INTO COMPLIANCE SHOULD FAILURE OF TEST DUE TO FACILITY WORK
<br /> a 4.9.3 CERTIFICATION ON APPROPRIATE FORMAT AS TO INSTALLATION OF COMPLETE SYSTEM BEING INVOICE PACKAGE. REQUIRE EXPENDITURE OF ADDITIONAL MONIES FOR RESCHEDULING AND/OR RETESTING OF SYSTEM, CONTRACTOR �
<br /> " COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS AND REGULATIONS. h'qT FCHAN�GPQ��
<br /> � PERFORMED !N
<br /> SHALL BE HELD RESPONSIBLE FOR COMPENSATION ACCORDINGLY. F pF CA1-�F
<br /> 4.9.4 CERTIFICATION THAT ALL EQUIPMENT EITHER SUPPLIED BY OWNER OR CONTRACTOR HAS BEEN 2.8 CLEANUP: IN THE EVENT PRODUCT SPILLAGE SHOULD OCCUR DURING CONSTRUCTION OR DURING WARRANTY PERIOD.
<br /> ERIOD 12/18/19
<br /> INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS BY PERSONNEL TRAINED AND QUALIFIED
<br /> a DUE TO WORK PERFORMED BY CONTRACTOR, CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AS MAY BE RE
<br /> ii FOR THAT SPECIFIC ITEM. SHEET:
<br /> 4 2.9 TEST REPORT: UPON COMPLETION OF TESTING PROGRAMS, REPRESENTATIVE OF TESTING/ INSPECTION COMPANY SHALL G13 , 0
<br /> BE RESPONSIBLE FOR FILING COPIES OF TANK AND PIPING TEST/INSPECTION REPORTS WITH LOCAL 7-ELEVEN, INC.
<br /> CONSTRUCTION OFFICE OR THE OWNER'S ASSIGNED SITE MANAGER WITH COPY TO JOB SITE.
<br /> FUELING - USA
<br /> �o