My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1515
>
2300 - Underground Storage Tank Program
>
PR0545645
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:44:03 AM
Creation date
8/3/2020 12:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0545645
PE
2351
FACILITY_ID
FA0025876
FACILITY_NAME
7 ELEVEN INC #38877
STREET_NUMBER
1515
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15904026
CURRENT_STATUS
01
SITE_LOCATION
1515 E MAIN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N J O A Q u I N Environmental Health Department <br /> -- COUNTY- <br /> 6 . A valid California Department of Tax and Fee Administration (CDTFA) number must be obtained and <br /> provided to EHD prior to fuel drop, and must be uploaded into CERS . <br /> 7. The following items must be completed prior to scheduling the final inspection : <br /> a . An accurate and drawn to scale as-built drawing, which indicates the location of the UST system <br /> (underground storage tanks, piping , auxiliary and monitoring equipment) with respect to buildings <br /> or other landmarks, per CCR 2711 (a)(8), must be submitted to EHD . <br /> b. Copies of any required installation checklists (tank, etc.) must be submitted to EHD. <br /> c. The designated operator (DO) training requirement must be satisfied , per CCR 2715(f) . <br /> d . Submit to the California Environmental Reporting System (CERS) all applicable hazardous <br /> materials, hazardous waste, and UST submittals. The submittal must be approved by EHD. <br /> 8. The installed UST system must be compliant with all applicable laws, regulations, and industry standards. <br /> All installation and testing shall be in compliance with manufacturer's instructions and CCR 2635 and 2636 . <br /> All monitoring system components shall be listed in the State Water Resources Control Board's Local <br /> Guidance Letter (LG) 113 . <br /> 9. All primary containment including any integral secondary containment system must be certified by an <br /> independent testing organization and labeled as required by the organization (California Code of <br /> Regulations Title 23 Chapter 16 (CCR) 2631 (b) ; UL , ULC , ANSI , API , ASTM , etc. See CCR Table B for <br /> complete list. ) . Pursuant to Underwriters Laboratories Inc. ( UL) listing requirements, only those products <br /> bearing the UL mark will be considered listed . ANY PART/PRODUCT NOT MARKED WITH THE UL <br /> LABEL OR ANOTHER LISTED TESTING ORGANIZATION WILL BE REJECTED. All secondary <br /> containment system which is not an integral part of the primary containment shall be designed and <br /> constructed according to an engineering specification approved by a state registered professional engineer <br /> or according to a nationally recognized industry code or engineering standard , per CCR 2631 (d). <br /> 10. All metal components in direct contact with the ground , such as flexible connectors, swing joints, fittings, <br /> clamps, bands, and pumps , shall have adequate corrosion protection . <br /> 11 . Install concrete of sufficient thickness over USTs and around sumps and dispensers , according to the <br /> manufacturer's written installation instructions and buoyancy calculations. <br /> 12 . All tank top openings that are connected to the primary space of the UST must have secondary <br /> containment, audible/visual alarm , and be vapor tight or terminate at grade. <br /> 13. Sumps, including UDCs, must be constructed in a manner to prevent vapors from entering the backfill. <br /> 14. All secondary containment must be constructed to prevent water intrusion and must be continuously <br /> monitored as required under HSC 25290. 1 . <br /> 15 . Chase piping must be VPH monitored and included in its respective product piping vacuum monitoring <br /> zone. All vacuum zone volumes must be accurately programmed and their volumes adequate for their <br /> respective vacuum sensors . All sensors must be installed to detect a leak at the earliest opportunity. <br /> 16. All appropriate test ports must be installed to facilitate frequent routine communication testing (e.gl at the <br /> beginning and end of each vacuum zone branch and inside brine filled sumps) . No additional shut off <br /> valves should be installed between the monitored interstitial spaces and their respective sensors. <br /> 17. Overfill prevention shall satisfy CCR 2635(b)(2)(C) , pursuant to the permit application . No ball floats shall <br /> be installed on vent lines to comply with overfill prevention requirements (Code of Federal Regulations, <br /> Title 40, section 280 . 20(c)) <br /> 3 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.