My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1515
>
2300 - Underground Storage Tank Program
>
PR0545645
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:44:03 AM
Creation date
8/3/2020 12:07:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0545645
PE
2351
FACILITY_ID
FA0025876
FACILITY_NAME
7 ELEVEN INC #38877
STREET_NUMBER
1515
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15904026
CURRENT_STATUS
01
SITE_LOCATION
1515 E MAIN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UL/ULC t ® " A Piping System <br /> SPECIFICATION 1 <br /> Primary Piping <br /> SECTION 1 - Scope <br /> This section covers the use of fiberglass reinforced plastic 2.06 Acceptable Manufacturers - NOV Fiber Glass <br /> (FRP) pipe for single wall fuel handling and fuel handling vent Systems, 501 -568-4010, or approved equal, <br /> and vapor applications Including gasoline, unleaded gasoline, <br /> gasoline/alcohol mixtures, blo-diesel , DEF and diesel up to Section 3 - Material and Construction '.. <br /> 150OF and 250 psig cyclic pressure , <br /> 3.01 2"- 4" Pipe - The pipe shall be manufactured by <br /> the filament winding process using an amine cured epoxy <br /> SECTION 2 - General Conditions thermosetting resin to Impregnate strands of continuous <br /> 2.01 Coordination - Material furnished and work glass filaments, which are wound around a mandrel at a '.. <br /> performed under this section shall be coordinated with the 543/4' winding angle under controlled tension . The pipe '.. <br /> related work and equipment specified under other sections, shall be heat cured and the cure shall be confirmed using a <br /> i.e. Valves, Flexible Connectors, Equipment, Differential Scanning Calorimeter. <br /> Pipe shall be supplied with a T. A. B . "' (Threaded and <br /> 2.02 Governing Standards - Except as modified or Bonded) ends. <br /> supplemented herein, all materials and construction methods Pipe shall have a minimum continuous cyclic pressure <br /> shall comply with and be tested in accordance with the rating of 125 psig at 150°F in accordance with ASTM D2992, <br /> following standards and test methods: Procedure A or UL 971 pressure rating . <br /> Standards and Test Methods All pipe shall be 100% hydrotested at the factory before <br /> shipment at a minimum pressure of 265 psig and shall be <br /> UL971 Standard for Nonmetallic Underground Piping for Flam- UL971 -2004 Listed and labeled. <br /> 2004 mable Liquids '... <br /> 3.02 ASTM D2310 Classlf!cations fat 73.40F) <br /> ASTM Standard Classification for Machine-Made "Fiberglass" 251 - 3" RTRP-11AF <br /> D2310 (Glass Fiber Reinforced Thermosetting Resin) Pipe '.. <br /> ASTM Standard practice for obtaining Hydrostatic or Pressure 4" RTRP-11AH <br /> D2992 Design Basis for "Fiberglass' (Glass Fiber Reinforced ( Mechanical properties cell classifications shown are <br /> Thermosetting Resin) Pipe and Fittings minimums.) <br /> 3.03 Fittings - All fittings shall be manufactured using <br /> 2 .03 Operatina Conditions - In addition to the above the same type of material as the pipe . Fittings may be <br /> listed minimum design requirements, the system shall meet manufactured either by compression molding , filament <br /> the following minimum operating conditions: winding, resin transfer molding or contact molding methods. <br /> All fittings, adapter, and sump penetrations shall be UL971 - <br /> a. Operating Pressure 2004 Listed . <br /> b. Fluid Conveyed Fittings shall be adhesive bonded matched tapered bell <br /> c. Test Pressure and spigot. <br /> 3.04 Connections - Connections to flex connectors or <br /> 2.04 Quality Assurance - Pipe manufacturer's quality other piping materials shall be made by the use of NPT <br /> program shall be In compliance with ISO 9001 and/or API Q1 . (National Pipe Thread) threaded adapters or flanges bonded <br /> to the FRP piping system. <br /> 2.05 Delivery. Storage and Handling - Pipe and fittings 3.05 Sump Penetrations - Sump penetrations shall be <br /> shall be protected from damage due to Impact and point made by means of a permanently bonded FRP coupling. The <br /> loading. Pipe shall be properly supported to avoid damage coupling shall be capable of adjusting for the slope of the <br /> due to flexural strain . The contractor shall not allow dirt, piping system entering or exiting the sump wall, <br /> debris or other extraneous materials to get into pipe and 3.06 Adhesives - Adhesives shall be manufacturer's <br /> fittings. All factory machined areas shall be protected from standard for the piping system specified. <br /> sunlight until installed , <br /> is <br /> V w ,fgspips .com fgspipe@nov.com <br /> NW Fiber Glass Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.