Laserfiche WebLink
3.07 Acceptable Products - RED THREAD IIA Piping Secondary Containment Pring <br /> System as manufactured by NOV Fiber Glass Systems or <br /> engineered approved equal. SECTION 1 - Scope <br /> This section covers the use of fiberglass reinforced plastic <br /> SECTION 4 - Installation and Testing (FRP) pipe for fuel handling and fuel handling vent and vapor <br /> 4.01 Training and Certification - All joints Installed or applications including gasoline, unleaded gasoline, gasoline/ <br /> constructed in the field shall be assembled by employees alcohol mixtures, bio-diesel and diesel that require secondary <br /> of the contractor who have been trained by the pipe containment. <br /> manufacturer. The pipe manufacturer or their authorized <br /> representative shall train the contractor's employees In the SECTION 2 - General Conditions <br /> proper joining and assembling procedures required for the <br /> '.. project, including hands-on participation by the contractor's 2.09 Coordination - Material furnished and work <br /> employees. Each bonder shall fabricate one pipe-to-pipe performed under this section shall be coordinated with the <br /> and one pipe-to-fitting joint that shall pass the minimum related work and equipment specified under other sections, <br /> pressure test for the application as stated In Section 2 .03 I .e. Valves, Flexible Connectors, Equipment. <br /> without leaking. <br /> Only bonders that have successfully completed the 2.02 Governing Standards - Except as modified or <br /> pressure test shall bond pipe and fittings. Each bonder shall supplemented herein, all materials and construction methods <br /> carry a current manufacturer's proof of training card. shall comply with and be tested in accordance with the <br /> 4.02 Pipe Installation - Pipe shall be installed as specified following standards and test methods: <br /> and Indicated on the drawings. '.. <br /> The piping system shall be Installed in accordance with the Standards and Test Methods: <br /> manufacturer's current published installation procedures. UL971 Standard for Nonmetallic Underground Piping for Flam- <br /> 4.03 Testing - A hydrostatic pressure test shall be 2004 mable Liquids '.. <br /> conducted on the completed piping system . The piping <br /> system shall be subjected to 10 pressurization cycles from 0 ASTM Standard Classification for Machine-Made "Fiberglass" <br /> psig to 1 . 5 times the design operating pressure as stated in D2310 (.Glass Fiber Reinforced Thermosetting Resin) Pipe <br /> Section 2.03.c. After the 10 cycles, the pressure shall be held ASTM Standard practice for obtaining Hydrostatic or Pressure <br /> on the system for a minimum of 1 hour and the line inspected D2992 Design Basis for "Fiberglass" (Glass Fiber Reinforced '..., <br /> for leaks. Thermosetting Resin) Pipe and Fittings <br /> Test pressures shall not exceed 1 .5 times the maximum <br /> rated pressure of the lowest rated element in the system. 2.03 Operating Conditions - In addition to the above <br /> All pipe joints shall be water tight. All joints that are found listed minimum design requirements, the system shall meet <br /> to leak, by observation or during testing, shall be replaced by the following minimum operating conditions: ,, <br /> the contractor and retested. a. Operating Pressure <br /> Should hydrostatic testing be impractical , testing with b. Fluid Conveyed <br /> low pressure air or Inert gas may be acceptable . Extreme c . Test Pressure <br /> caution should be used when testing with air. Follow all <br /> safety precautions and testing recommendations of the pipe 2.04 Quality Assurance - Pipe manufacturer's quality <br /> manufacturer. program shall be in compliance with ISO 9001 and/or API Q1 . <br /> 2.06 Delivery Storage and Handling - Pipe and fittings <br /> shall be protected from damage due to Impact and point <br /> ',. loading. Pipe shall be properly supported to avoid damage <br /> due to flexural strain. The contractor shall not allow dirt, <br /> debris or other extraneous materials to get Into pipe and <br /> fittings. All factory machined areas shall be protected from <br /> sunlight until Installed . <br /> 2.06 Acceptable Manufacturers - NOV Fiber Glass <br /> Systems, 501 -568-4010, or approved equal . <br />