Laserfiche WebLink
Mr. Alan Biedermann <br /> Page 2 <br /> In order to process this item Board staff will need the following <br /> documents: <br /> 1. A Notice of Proposed Facility filed by the project proponent <br /> with this Board as required by the CCR Section 17936, and <br /> containing the information specified in CCR Section 17927- <br /> 17929. <br /> 2. A written statement from the County that the facility <br /> complies with GC Section 66784.2, regarding distance from <br /> residential structures. <br /> 3. A written finding from the County Solid Waste Management <br /> Plan (CoSWMP) Planning Liaison indicating that the facility <br /> is in Conformance with the approved San Joaquin CoSWMP, as <br /> required by CCR Section 17937 . <br /> 4. A written finding by the County Planning Agency that the <br /> facility is consistent with the County General Plan, as <br /> required by GC Section 66796.41. Before this finding can be <br /> made the following conditions must be met: <br /> A. The project is located in a land use area designated or <br /> authorized for a solid waste facility in the County <br /> General Plan. <br /> B. The adjacent land uses are compatible with the <br /> establishment of the site. <br /> Before the Board can consider both the Determination of <br /> Conformance and Concurrence with the Solid Waste Facilities <br /> Permit, an environmental document which fully complies with the <br /> California Environmental Quality Act (CEQA) must be prepared for <br /> this project. Since the Board must act as a responsible agencym_w <br /> under CEQA when it takes discretionary actions on the pro ' c <br /> the draft environmental document will need to be cir ated <br /> through the State Clearinghouse for review_ as re red by State <br /> CEQA Guidelines Section 15073 (c) . The ount lso will need to <br /> file Notice of Determination with the my Clerk and the State <br /> Clearinghouse as required by CEQA Guidelines Section 15075 (d) . <br />