My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-1989
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9069
>
4400 - Solid Waste Program
>
PR0440001
>
COMPLIANCE INFO_1987-1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 10:58:26 AM
Creation date
8/4/2020 12:10:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-1989
RECORD_ID
PR0440001
PE
4433
FACILITY_ID
FA0004514
FACILITY_NAME
AUSTIN ROAD/ FORWARD LANDFILL
STREET_NUMBER
9069
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
9069 S AUSTIN RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440001_9069 S AUSTIN_1987-1989.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stephen <br />July 11, ..: <br />Page 2 <br />The drawdown during development pumping •' subsequent recove <br />was monitored using a data logger and pressure transducers. The d <br />gathered are presently • •'analyzedandwill •reported ... <br />corrective action • . well effluent discharged • - ar <br />between the landfill access road and the California Youth Authority (CY <br />southern boundary • . •: discharge point .. •with, an* <br />agreed to, by Robert Evans of the Regional Water Quality Control Boar <br />Central Valley Region. <br />EMCON drilled and installed the six new 2 -inch ground -water monitoring <br />wells (MW -8 • • from • .1991. The <br />approximate m• • s well locations• on • 1. These <br />locations are consistent with those proposed in the April 24, 1991, verifi- <br />cation monitoring program report and conceptual corrective action plan. <br />Sampling pumps will be installed in four of the wells (MW -10 through <br />bythe end of <br />A PTA 1517 �� <br />New landfill monitoring requirements under 23, Article •... .. <br />fornia Code of Regulations became effective on July 1, 1991. The water <br />quality protection standards portion of EMCON's scope of work for the <br />Austin Road Landfill, wh ' i ' ch was based on the former Article 5, should be <br />amended to address the new requirements. <br />The current Article 5 requires landfill owners or operators to prepare an <br />evaluation monitoring plan that meets the requirements of the article. The <br />.monitoring plan must be submitted to the California Regional Water Qual- <br />Control Board by '•2. Section 2550.9 of describes <br />requirements of an evaluation monitoring program. The pertinent elements <br />of evaluation monitoring are listed in Figure 1. Several of these require- <br />ments have already been met or will be met as part of the corrective action <br />EMCON's scope of work for this task will be to prepare an evaluation <br />monitoring plan for the Austin Road Landfill consistent with the require- <br />ments of Article plan willidentifythoseSf. - ... .. <br />ve <br />already been met, those that will be met as part of the corrective action <br />PJB\B02\B020104E <br />
The URL can be used to link to this page
Your browser does not support the video tag.