Laserfiche WebLink
Mr. Stephen Chen <br />July 11, 1991 <br />R Page 3 <br />wct B02-01.04 <br />plan, and those that are not applicable at the site. The plan will focus on a <br />proposed evaluation monitoring program that includes the following: <br />• monitoring network (ground -water monitoring wells and <br />surface -water monitoring points) <br />• chemical parameters <br />• sampling frequency <br />• sampling and analysis procedures <br />• statistical analysis procedures <br />• reporting procedures <br />submitEMCON will _ draft monitoring plan forthe Citys review by • l <br />15,1991. <br />Options •r the location of ground -water system depend on <br />the potential realignmentof c South ForkJohn's <br />understand that this realignment may occur in conjunction with a landfill <br />expansion. •' requests informationon of • rc • for <br />realignment. Location options being considered are <br />• on the landfill near the maintenance area south of EW -1 <br />• between the landfill access road and the CYA road <br />• in the field north of the CYA road <br />• near the entrance to the landfill <br />These options assume that Little John's Creek will be the discharge point <br />of the effluent from the treatment system. However, selecting the location <br />•..f the system is criticalwith regardto design on piping, pumping, <br />and gravity flow for discharge .. John's City • •. <br />locationsconsider these locations and any other of • <br />decision on the location should be made by the City no later than <br />August <br />15,19 <br />. <br />- San Joaquin• oo Control District hasbeen contacted and <br />verbally approved the discharge to the creek. A letter to the district <br />verifying its approval will be prepared with copies distributed to the City of <br />PJB\B02\B020104E <br />