My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
401
>
4200 – Liquid Waste Program
>
PR0526172
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 7:50:28 PM
Creation date
8/5/2020 10:00:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0526172
PE
4242
FACILITY_ID
FA0017710
FACILITY_NAME
ANKA NORTHSTAR
STREET_NUMBER
401
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
24130052
CURRENT_STATUS
01
SITE_LOCATION
401 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\A\AIRPORT WAY\401\PR0526172\INSPECT CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
InstaIIat om Cohle: &gidentiai AdvanTj � Systems <br /> /e� �f <br /> •��,; <br /> .:a�cr7^'„�k �k!5.:;�'.3�,Y.�'I,.�., <br /> Follow the generic steps on this page and the panel-specific <br /> (VenCommo or MVP) steps on the next few pages to ensure the <br /> system is operational. <br /> Step 1: For Mode B installations, fill the pump basin with <br /> water to a level just below the lowest float. <br /> Step 2: Verify both manual and automatic operation of the <br /> recirculation pump.Before running the pump, ensure that the <br /> tank's water level is at least 4" above the bottom float,but below <br /> the top float. Be sure that you have temporarily disconnected the <br /> manifold union.Flip the MOA toggle switch in the control panel <br /> to"Manual"to test manual operation of the pump and clear any <br /> debris in the transport piping. <br /> Step 3: Reconnect and hand-tighten the manifold union. With <br /> the pump running in the manual position, open each lateral ball <br /> valve individually for 5 or 10 seconds to flush any construction <br /> debris out of the piping. Be sure all lateral valves are completely <br /> closed after flushing is complete.With the pump still running <br /> manually,remove several orifice shields and measure the squirt <br /> ylo. f height with a tape measure. The squirt height should measure <br /> approximately 3'-5'. Windy conditions will cause the squirt <br /> heights to measure less. <br /> Step 4: For more accurate residual measurements,attach a piece <br /> of clear PVC to'the end of the lateral.Record the residual head <br /> measurement at start-up and before and after servicing. <br /> Step 5: Return the MOA switch to"Automatic."To facilitate <br /> quick testing of the automatic operation,temporarily set the <br /> programmable timer to short intervals,but no shorter than 15 <br /> seconds on, 15 seconds off. <br /> Step 6: Fill the tank with clean water up to a level <br /> approximately one inch above the RSV cage.At this point the <br /> water level should be well above the bottom float. In the control <br /> panel,turn on the pump by switching the MOA toggle to the <br /> "Manual"position.As water begins running through the system, <br /> ensure proper drainage through the filtrate return line and RSV. <br /> All or some of the return filtrate flowing to the RSV should be <br /> exiting the system through the final discharge line. Check that no <br /> water is leaking at any of the plumbing joints. <br /> 0 2004 Orneao Systems*Inc. HIM-M-AX-1 <br /> Rey 3.1,004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.