My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005975
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
3500 - Local Oversight Program
>
PR0545950
>
ARCHIVED REPORTS_XR0005975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 1:01:21 AM
Creation date
8/6/2020 10:50:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005975
RECORD_ID
PR0545950
PE
3528
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
02
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• limit of hydrocarbon impacted soils and re-sampling the groundwater monitor wells A Problem <br /> Assessment Report was prepared by SECOR on May 31, 1994 <br /> On August 26, 1994, a Final Remedial Plan (FRP) prepared by SECOR was submitted to the <br /> PHS/EHD for public notification and regulatory approval Before the FRP could be implemented, <br /> the State Water Resources Control Board, prompted by a study conducted by Lawrence Livermore <br /> National Laboratory, issued a statement suggesting that intrinsic bioremediation should be considered <br /> an acceptable remedial option in"low risk" cases Based on tins information and discussions with the <br /> I <br /> PHS/EHD, Time Oil Company authorized SECOR to prepare this work plan to verify that petroleum <br /> hydrocarbons in soil at the site are being degraded by natural processes <br /> 3.0 SCOPE OF WORK <br /> 3 1 Health and Safety Plan <br /> iPrior to conducting any field work, SECOR will implement the site-specific health and safety plan for <br /> drilling activities as required by 29 CFR 1910 120 The health and safety plan details field procedures <br /> regarding vanous potential safety hazards that maybe encountered during site activities A copy of <br /> the health and safety plan for this site is included in Appendix B of this work plan <br /> 32 Utilgy Clegance <br /> Prior to conducting any field work, SECOR will conduct a utility clearance of the drilling area to <br /> ensure that subsurface utilities are not intercepted during the drilling activities Additionally, <br /> Underground Service Alert (USA) will be notified prior to drilling <br /> 33 Rermittin <br /> SECOR will acquire the necessary drilling permit from the PHS/EHD All drilling will be performed <br /> by a drilling company with the appropriate license for drilling in the state of California and approved <br /> in San Joaquin County <br /> 2 agf,`OR <br /> NDG05-1 al .4pnl 17 1996 <br /> NUon7-042 al <br />
The URL can be used to link to this page
Your browser does not support the video tag.