Laserfiche WebLink
• limit of hydrocarbon impacted soils and re-sampling the groundwater monitor wells A Problem <br /> Assessment Report was prepared by SECOR on May 31, 1994 <br /> On August 26, 1994, a Final Remedial Plan (FRP) prepared by SECOR was submitted to the <br /> PHS/EHD for public notification and regulatory approval Before the FRP could be implemented, <br /> the State Water Resources Control Board, prompted by a study conducted by Lawrence Livermore <br /> National Laboratory, issued a statement suggesting that intrinsic bioremediation should be considered <br /> an acceptable remedial option in"low risk" cases Based on tins information and discussions with the <br /> I <br /> PHS/EHD, Time Oil Company authorized SECOR to prepare this work plan to verify that petroleum <br /> hydrocarbons in soil at the site are being degraded by natural processes <br /> 3.0 SCOPE OF WORK <br /> 3 1 Health and Safety Plan <br /> iPrior to conducting any field work, SECOR will implement the site-specific health and safety plan for <br /> drilling activities as required by 29 CFR 1910 120 The health and safety plan details field procedures <br /> regarding vanous potential safety hazards that maybe encountered during site activities A copy of <br /> the health and safety plan for this site is included in Appendix B of this work plan <br /> 32 Utilgy Clegance <br /> Prior to conducting any field work, SECOR will conduct a utility clearance of the drilling area to <br /> ensure that subsurface utilities are not intercepted during the drilling activities Additionally, <br /> Underground Service Alert (USA) will be notified prior to drilling <br /> 33 Rermittin <br /> SECOR will acquire the necessary drilling permit from the PHS/EHD All drilling will be performed <br /> by a drilling company with the appropriate license for drilling in the state of California and approved <br /> in San Joaquin County <br /> 2 agf,`OR <br /> NDG05-1 al .4pnl 17 1996 <br /> NUon7-042 al <br />