Laserfiche WebLink
., 3 6 Reporting <br /> SECOR will prepare a report describing the proposed investigation including <br /> ■ Details of field procedures and operations <br /> ■ Geoprobe logs <br /> ■ Analytical results <br /> ■ Conclusions <br /> ■ Request for closure (if appropriate) <br /> 4 0 SCHEDULE <br /> Upon approval of this work plan, and receipt of a permit from the PHS/EHD the necessary <br /> arrangements for drilling and installing wells at the subject site will be scheduled The projected start <br /> date for the drilling is late April 1996 The technical report will be submitted to Time Oil Company <br /> within 45 days from the completion of field activities <br /> tOC143S WP2 /� 9ECOA <br /> W0005 002 01 4 Apnl 17 19% <br />