Laserfiche WebLink
approximately as shown on Figure 2 The actual placement and depth will be dependent on the <br /> Ilocation of existing on-site utilities Piping installed in the trench will consists of 2-inch diameter <br /> schedule 40 PVC which shall be sloped toward each of the extraction wells The piping will be <br /> pressure tested prior to backfilling <br /> ASECOR field geologist will observe the construction of the soil vapor line trenches and screen <br /> the excavated soil with a photoiomzation detector (PID) If hydrocarbon impacted soils are <br /> observed in the trenches during the construction activities, 4-inch diameter schedule 40 PVC <br /> piping will be installed horizontally at the base of the trench and plumbed to the treatment <br />' compound The piping shall be fitted with 0 020-inch slotted well screen through the areas of <br /> impacted soil The horizontal vapor extraction piping shall be burred a minimum of 24 inches bgs <br />' with 318-inch pea gravel A layer of plastic sheeting shall be placed in the trench above the pea <br /> gravel backfill to reduce ground surface air flow once the extraction system is in operation <br /> The contractor shall compact the trench bottom and remove sharp objects to provide a smooth <br /> compacted trench bottom prior to placing bedding material The trench above the pea gravel and <br /> sheeted plastic which contains the 2-inch vapor lines may be backfilled with the soil removed <br /> during the trench excavation if petroleum hydrocarbons are not detected with the PID <br /> Otherwise, imported material will needed Backfill shall be free of organic material, rocks greater <br /> than 3-inches in diameter, and any deleterious material The lifts of the backfill shall not exceed 6- <br /> inches compacted using hand tamping equipment only The final lift shall be of portland concrete <br /> or asphalt concrete in accordance with the existing surface conditions A cross-section of the <br /> trench is shown in Figure 2 <br /> I23 Above Ground Ping <br /> The vapor transport lines shall be stubbed up vertically from the trench to the inside of the <br /> treatment compound Each pipe run shall be individually valved and manifolded together to form <br /> a "metering rack" (Figure 3) Valved sample ports with 114-inch barbed hose fittings shall be <br /> 1434VES ICU SECOR <br /> fab No NOW5-W2�41 March 13 1995 <br /> f <br />