My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005984
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
3500 - Local Oversight Program
>
PR0545950
>
ARCHIVED REPORTS_XR0005984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 12:42:01 AM
Creation date
8/6/2020 10:53:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005984
RECORD_ID
PR0545950
PE
3528
FACILITY_ID
FA0003739
FACILITY_NAME
Colonial Energy CE 40134 (DBA Power Mart)
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
02
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approximately as shown on Figure 2 The actual placement and depth will be dependent on the <br /> Ilocation of existing on-site utilities Piping installed in the trench will consists of 2-inch diameter <br /> schedule 40 PVC which shall be sloped toward each of the extraction wells The piping will be <br /> pressure tested prior to backfilling <br /> ASECOR field geologist will observe the construction of the soil vapor line trenches and screen <br /> the excavated soil with a photoiomzation detector (PID) If hydrocarbon impacted soils are <br /> observed in the trenches during the construction activities, 4-inch diameter schedule 40 PVC <br /> piping will be installed horizontally at the base of the trench and plumbed to the treatment <br />' compound The piping shall be fitted with 0 020-inch slotted well screen through the areas of <br /> impacted soil The horizontal vapor extraction piping shall be burred a minimum of 24 inches bgs <br />' with 318-inch pea gravel A layer of plastic sheeting shall be placed in the trench above the pea <br /> gravel backfill to reduce ground surface air flow once the extraction system is in operation <br /> The contractor shall compact the trench bottom and remove sharp objects to provide a smooth <br /> compacted trench bottom prior to placing bedding material The trench above the pea gravel and <br /> sheeted plastic which contains the 2-inch vapor lines may be backfilled with the soil removed <br /> during the trench excavation if petroleum hydrocarbons are not detected with the PID <br /> Otherwise, imported material will needed Backfill shall be free of organic material, rocks greater <br /> than 3-inches in diameter, and any deleterious material The lifts of the backfill shall not exceed 6- <br /> inches compacted using hand tamping equipment only The final lift shall be of portland concrete <br /> or asphalt concrete in accordance with the existing surface conditions A cross-section of the <br /> trench is shown in Figure 2 <br /> I23 Above Ground Ping <br /> The vapor transport lines shall be stubbed up vertically from the trench to the inside of the <br /> treatment compound Each pipe run shall be individually valved and manifolded together to form <br /> a "metering rack" (Figure 3) Valved sample ports with 114-inch barbed hose fittings shall be <br /> 1434VES ICU SECOR <br /> fab No NOW5-W2�41 March 13 1995 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.