Laserfiche WebLink
140769 <br /> f <br /> WALL MW-2 <br /> BLOCK (<10/<0 3) <br /> r <br /> NASPHALTEXPLANATION <br /> PAVING B-11/MW-4+ Soll Boring/Monitoring Well <br /> CONCRETE • So11 Boring <br /> r <br />' (<101t�0 3)' B 0 (<10/<O 3) Concentration Of Total Petroleum <br /> Hydrocarbons As Gasoline In Parts <br /> Pdr Billion (ppb)/Concentration <br />' F Of Benzene In ppb <br /> STATION Samples Collected On July 18, 1994 <br /> r BUILDING <br /> I <br /> 1 CONCRETE B-2• <br /> TANK <br />' <br /> 8PAD <br /> --12 CONCRETE WALKWAY :_6 <br /> • �' •8-13 <br />' B-4• B-7 <br /> • <br /> • 4 <br /> B—i <br /> ASPHALT <br />' PUMP <br /> PAVING <br /> ISLANDS ASPHALT <br /> ON CONCRETE PAVING <br /> PAD <br />' B-5 I <br /> 1 <br /> MW-4 MW-3 <br /> (<10/<0 3) Light Pole (<10/<O 3) <br />' CONC CURB PROJECT ASSUMED EAST <br /> AC CURB DRIVEWAY <br />' DRIVEWAY <br /> YOSEMITE AVEN UE 20 o zo 40 <br /> Source: Map modified from map ,provided kpproxiMOte Scale (feet) <br />' by Tom 0. Morrow Inc. <br /> 6184 <br /> ARCO PRODUCTS COMPANY FIGURE <br /> ARCO SERVICq STATION NO 6020 <br /> E m c on 1711 YOSEMITE AVENUE 1 <br /> MA <br /> Associates NTECA CALIFORNIA <br /> PROJECT NO <br /> Sacramento, California GENERALIZED SITE PLAN (JULY 18, 1994) 0805-111 01 <br />